Laserfiche WebLink
<br />" <br />;.~ <br /> <br />~ <br /> <br />"7 <br /> <br />~~, <br />.:~ <br /> <br />c.c <br />'<:l" <br />N <br />o <br />o <br /> <br />. <br /> <br />Two 1,000 gpm contact clarifiers with chemical storage and feed sys- <br />tems <br /> <br />. One 7,500,000 gal Ion membrane I ined surge pond with three 900 gpm <br />pumps <br /> <br />. <br /> <br />Two 550 gpm vapor compression evaporators with deaerators, chemical <br />storage and feed systems, control room and product storage <br /> <br />~.; <br />, <br /> <br />. <br /> <br />110 acres of membrane I ined evaporation ponds with 15 foot depth <br /> <br />. <br /> <br />" <br /> <br />Option I I (LV) - Side~tream Softening/VCE/Evaporation Pond <br /> <br />The battery I imits for the sldestream softening system include the inlet to <br />the softener surge pond, the discharge from the neutralization pond pumps, <br />the inlet to the wastewater surge pond and the inlet to the evaporation ponds. <br />The wastewater treatment boundaries includes the inlet to the surge pond, the <br />makeup to the condensate system and the evaporation ponds. Water system <br />equipment for the Option I I cost estimate includes: <br /> <br />~. <br /> <br />. One 5,500,000 gallon membrane I ined softener surge pond with three <br />3,500 gpm pumps <br /> <br />. Two 6,000 gpm softeners with chemical storage and feed systems <br /> <br />. One 5,500,000 gallon membrane lined neutral ization basin with three <br />3,500 gpm pumps <br /> <br />. <br /> <br />One 7,500,000 gallon membrane I ined surge pond with three 800 gpm <br />pumps <br /> <br />< <br /> <br />,: <br /> <br />, <br /> <br />. Two 500 gpm vapor compression evaporators and one 250 gpm vapor com- <br />pression evaporator with deaerators, chemical storage and feed sys- <br />tems, control room and product storage <br /> <br />. 133 acres of evaporation ponds with 15 foot depth <br />Option I II (LV) - Frontend Softening/VCF/Evaporatlon Ponds <br /> <br />The battery I imits for the makeup softening system include the raw water inlet <br />to the softeners, the Inlet to the cool ing tower basins and the inlet to the <br />evaporation ponds. The wastewater treatment boundaries includes the Inlet to <br />the surge pond, the makeup to the condensate system and the evaporation ponds. <br />Water system equipment for the Option I II cost estimate includes: <br /> <br />~ <br /> <br />. <br /> <br />Two 9,000 gpm capacity softeners with chemical storage and feed sys- <br />tems <br /> <br />~ <br /> <br />':i. <br />" <br /> <br />. <br /> <br />One 5,500,000 gal Ion concrete lined collection basin with three <br />9,000 gpm pumps <br /> <br />" <br />, <br /> <br />" <br /> <br />5-2 <br />