Laserfiche WebLink
<br />'.... <br /> <br />I~ <br />co <br />~ <br />C\l <br />c. <br />,-- <br />.....' <br /> <br />~~ <br /> <br />", <br /> <br />. <br /> <br />One 8,000,000 gal Ion membrane I ined neutral ization basin with three <br />800 gpm pumps <br /> <br />. Two 550 gpm vapor compression evaporators and one 300 gpm brine <br />vapor compression evaporators with deaerators, chemical storage and <br />feed systems, control room and product storage <br /> <br />':: <br /> <br />", <br /> <br />. 34 acres of membrane I ined evaporation ponds with 15 foot depth <br /> <br />.. <br /> <br />EquIpment Cost Sllmmary <br /> <br />:'- <br /> <br />The total capital cost for water system equipment <br />ment, engineering and installation/construction. <br />summarized on Table 5-1. <br /> <br />and ponds includes equip- <br />These estimated costs are <br /> <br /><; <br /> <br />CHEMICAL COSTS <br /> <br />The estimated cost of chemicals FOB the <br />on Table 5-2. The chemical consumption <br />capacity factor of 76% is summarized on <br />rates are shown in the process flow and <br /> <br />Harry Allen plant site are summarized <br />cost for each option at a plant <br />Table 5-3. The annual chemical usage <br />material balances found in Appendix C. <br /> <br />POWER USAGE <br /> <br />Annual power usage is based on a 76% capacity factor, assuming 5 kwh/l,OOO <br />gallons for cool ing water system pumping and 90 kwh/l,OOO gallons for water <br />treated by the brine concentrators. Power usage for the five options is shown <br />on Table 5-4. The energy cost factor provided by Nevada Power Company in- <br />cludes both energy and demand and is addressed in the comparison of total <br />levelized costs. <br /> <br />OPERATING LABOR AND MAINTENANCE COSTS <br /> <br />Operating and maintenance costs are based on a labor rate of $50,000 per <br />manyear, 0.75% of total capital cost for repair materials and 0.3% of total <br />capital cost for maintenance labor. An additional labor cost of $100,000 per <br />manyear was added to the ion exchange softening configuration (Option I) to <br />account for a higher degree of technical support than the other options. <br /> <br />The estimated annual operating and maintenance costs are presented In Table <br />5-5. <br /> <br />(~ <br /> <br />".": <br /> <br />.~. <br /> <br />5-4 <br /> <br />:'~ <br /> <br />,. <br /> <br />;~ <br /> <br />:::i <br />r.' <br />, <br /> <br />" <br />