My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07895
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:20 PM
Creation date
10/12/2006 2:40:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - US DOI-BOR - Region 4
State
CO
Basin
Statewide
Date
5/1/1967
Author
DOI-BOR
Title
Report by the BOR to the CWCB - Region 4
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Oll0683 <br /> <br />. <br /> <br />. <br /> <br />. downstream from the dam and installation of the 250-ton powerplant over- <br /> <br />head crane. Overall completion of the contract is about 80 percent. <br /> <br />On May 23 the Bureau of Reclamation will open bids for the removal <br /> <br />of water from the outlet works stilling basin at Navajo Dam. This will <br /> <br />include construction of a coffer dam around the area and pumping of <br /> <br />water so that prospective bidders for repair and modification of the out- <br /> <br />let works stilling basin may inspect the work site. Bids for the modifi- <br /> <br />cation work will be taken shortly after the stilling basin is dewatered, <br /> <br />probably around the first of August. <br /> <br /> <br />~ On the Silt Project, surfacing of relocated Colorado State Highway <br /> <br /> <br />325 across Rifle Gap Dam will start this month. The road surface is one <br /> <br />of the finishing touches to the $4 million project, which will start sup- <br /> <br />plying irrigation water this sunnner. The project is expected to be com- <br /> <br />pleted by the first of June. The reservoir is now about one-third full. <br /> <br />Modification of the diversion works, for the Smith Fork Feeder Canal <br /> <br />of the Smith Fork Project is essentially completed. <br /> <br />The contractor at Silver Jack Dam, Bostwick Bark Project, has resumed <br /> <br />work after being shut down since last November. Last fall the damsite area <br /> <br />was cleared and stripping operations were nearly completed. <br /> <br />The contract for repairs to the lining of the Gunnison Tunnel on the <br /> <br />Uncompahgre' Project was completed on March 22, 1967. <br /> <br />The major features of the CRSP transmission system still under construc- <br /> <br />tion are the Poncha-Midway 230-kv line and substations at Midway and Rifle, <br /> <br />all scheduled for completion in 1968. In the near future we will be em- <br /> <br />barking on the installation of a new type of equipment for the transmission. <br /> <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.