My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07895
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07895
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:20 PM
Creation date
10/12/2006 2:40:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - US DOI-BOR - Region 4
State
CO
Basin
Statewide
Date
5/1/1967
Author
DOI-BOR
Title
Report by the BOR to the CWCB - Region 4
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />o 0.0 6 8 2 <br /> <br />. <br />~vt-#-<:'/- <br /> <br />: <br /> <br />/:'1"" -; <br />.?"f_"::t'l<~'.-,,,,(,,/t!t,.....(!:r"- <br />'-./ <br /> <br />REPORT BY THE BUREAU OF REX;LAMATION, REGION 4 <br />TO THE COLORADO WATER CONSERVATION BOARD <br /> <br />May 1, 1967 <br /> <br />CONSTRUCTION <br /> <br />So far as construction on the various Reclamation projects of inter- <br /> <br />est to this Board is concerned, we can once again report satisfactory <br /> <br />progress. Those contractors who were forced to suspend operations for <br /> <br />the winter are now back on the job and construction goes ahead in full <br /> <br />swing. <br /> <br />At Glen Canyon Dam the contractor has essentially finished all work <br /> <br />connected with installation of the left diversion tunnel plug and spill- <br /> <br />way elbow. The new visitor center at the dam nears completion. We ex- <br /> <br />pect to have it open sometime in July to acconnnodate the many visitors <br /> <br />to the area this summer. <br /> <br />The completion contract at Blue Mesa Dam is about 80 percent com- <br /> <br />plete. Because some delay has been experienced in installation of the <br /> <br />turbines: and electrical work, we now estimate that the first generator <br /> <br />will go on the line sometime in July, rather than June. <br /> <br />Concrete placements in Morrow Point Dam were started for the season <br /> <br />on March 27. The dam will be topped out this summer--probably about the <br /> <br />end of August. The contractor has been busy through the winter on other <br /> <br />phases of the work. He has completed placement of concrete in the under- <br /> <br />ground powerplant; has completed the concrete work in both penstocks and <br /> <br />in both draft tube tunnels; and is placing concrete in the stilling basin <br /> <br />and the weir. Work is also progressing on excavation of the river channel <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.