My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07823
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07823
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:02 PM
Creation date
10/12/2006 2:37:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.200
Description
Narrows Unit - Mailing Lists Correspondence
State
CO
Basin
South Platte
Water Division
1
Date
9/1/1961
Author
US DoI BoR
Title
Site Selection Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2311 <br /> <br />I <br /> <br />Refinement of data and costs for Wiggins Daul and Reservoir is not <br />warranted because the most conservative estin~te of $10,500,000 <br />is substantitally greater than the Bijou control ~lOrks associated <br />with Narrows Dam and Reservoir. <br /> <br />Control at Narrows Reservoir <br /> <br />A preliminary cost estimate \TaS also made for controlling Bijou <br />Creek floods by di~'eG and channelizing into the potential NarrOlls <br />Reservoir. This was the plan proposed in the 1951 report. Costs <br />were taken from this report and indexed to present price levels. <br />They include costs for relocations, dikes, and ',aterways. To these <br />costs \/ere added rights-of-way associated "ith control of Bijou <br />Creelt. The total costs were about $4,870,000. The Corps of Engineers <br />has indicated a need for 40,000 acre-feet more flood control space <br />in Narrows Reservoir if Bijou Creek is diverted into it. Also, about <br />90,000 acre-feet more space would be l'equired for 100 years of <br />sediment contributed by Bijou Creek. This additional 130,000 acre- <br />feet of spacc would require about 3 feet additional height on the <br />dam at an estimated added cost of $1,369,000. <br /> <br />...... <br /> <br />The total cost of including Bijou Creek Control in Narrows Reservoir <br />is estimated to be $6,239,000. Controlled ground water recharge <br />could not be provided by this plan. <br /> <br />f, <br /> <br />The attached Dra'ling #553-730-3 ShOUB the channelization plan which <br />would require abandonment of the existing Bijou Reservoir No.2. <br /> <br />Data and Costs--Narrows Reservoir <br /> <br />The reconnaissance cost estimate for the potential Narrm-Is Reservoir <br />without Bijou Creel, control is $38,334,000 at February 1961 prices. <br />This cost includes $6,520,000 for right-of-llay end $1,525,000 for <br />relocations and protcctive works associated \~th oil development in <br />the reservoir site. Approximately 7,300 acres of irrigated crop land <br />and 1,000 acres of meadOll land would be purchased. The damsite is <br />at the location used in the 1951 report, about 7 miles upstream from <br />Fort Morgan, Colorado. The dsm "ould have a crest length of about <br />4 miles end a crest elevation of 4,449 feet (5 feet lower than shown <br />in the 1951 report because of less severe flood routing requirements). <br />The height above streambed "ould be about 142 feet. The dam uould <br />be earthfill, and it would have riprap on the upstream face. About <br />11 million cubic yards of embankment llould be required for the dam. <br /> <br />Allocation of the storage space including provision for Bijou Creek <br />control is listed by functions in Table 4. <br /> <br />'. <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.