|
<br />COLORADO RIVER STORAGE PROJECT
<br />CENTRAL UTAH PARTICIPATING PROJECT
<br />(Continued)
<br />
<br />.
<br />
<br />Project Works
<br />
<br />,The principal project features would include construction of the 36.8-
<br />mile long Strawberry aqueduct along the south slope of the Uinta Mpuntains
<br />intercepting Uinta Basin streams as far east as Rock Creek, enlargement of
<br />the Strawberry Reservoir through construction of the Soldier Creek Dam, an
<br />enlargement of the Strawberry Reservoir tunnel, four powerplants with a
<br />combined generating capacity of 61,000 kw, numerous reservoirs inoluding
<br />five with capacities over 30,000 acre-feet:
<br />
<br />Starvation Reservoir
<br />Upper Stillwater Reservoir
<br />Strawberry Reservoir
<br />Stanaker Reservoir
<br />Bates Reservoir
<br />
<br />160,000 acre-feet total capacity
<br />31,500 acre-feet totCll capacity
<br />1,370,000 acre-feet total capacity
<br />37,000 acre-feet total capacity
<br />65,000 acre-feet total capacity
<br />
<br />Aqueducts (including the 28.4 mile long Wasatch), and canals and (listri-
<br />bution systems as necessary to deliver and utilize tn!:l increased water
<br />supply. Drainage would be provided when necessary,
<br />
<br />.
<br />
<br />Constru<;!$ion Cost and Repayment-Initial Phase
<br />
<br />Estimated cost
<br />, Reimbursable cost allocated to:
<br />Irrigation
<br />Power
<br />Municipal and industrial water
<br />Ultimate development
<br />Total
<br />Nonreimbursable cost allocated to:
<br />Flood control
<br />Recreation
<br />Forest resource development
<br />Total
<br />Repayment of reimbursable costs by:
<br />Irrigation costs
<br />From water users
<br />From Central Utah
<br />project power revenue 27,838,00011
<br />From Colorado River
<br />Storage project power
<br />revenues
<br />Total
<br />Power costs from proJect
<br />power revenues
<br />Municipal & Inct. water costs by
<br />users
<br />Total Repaym_e.rl_
<br />
<br />.
<br />
<br />\
<br />
<br />$ 231,044,000
<br />
<br />$127,3&4,000
<br />46, 69!il,OOO
<br />45,500;000
<br />5, 50ef, 000
<br />. .II
<br />
<br />225,053,000
<br />
<br />3;113,000
<br />2,830,000
<br />48,000
<br />
<br />5,991,000
<br />
<br />15,191,000
<br />
<br />84,3Z5,OOO 2/ '
<br />127,354,000
<br />
<br />46,699,000
<br />
<br />45,500,000
<br />
<br />219,553,000
<br />
|