Laserfiche WebLink
<br />COLORADO RIVER STORAGE PROJECT <br /> <br />. <br /> <br />CENTRAL UTAH PARTICIPATING PROJECT <br />(Continued) <br /> <br />Annual O&M&R Costs <br /> <br />Irrigation <br />Power <br />Municipal and ind\.lst.vial wat,er <br />Total <br /> <br />253,930 <br />445,900 <br />69, 1 60 <br /> <br />768,990 <br />, <br /> <br />Benefit-Cost Ratio <br /> <br />l.23tol <br /> <br />. <br /> <br />11 Available from net power revenues from Central Utah Project <br />powerplants over a 17-year,periodfoUowing payment ofGUP power <br />costs, but prior to the end of the 50-year repayment period on the last <br />irrigation block. , <br /> <br />1:1 A one mill tax \.lllderth,e Utah Water Conservancy Act <br />cO\.lld appreciably reduce tbl.:samO\.lnt. <br /> <br />. <br /> <br />-46... <br />