My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07800
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:57 PM
Creation date
10/12/2006 2:36:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.25
Description
CRSP
Basin
Colorado Mainstem
Date
12/15/1960
Author
UCRC
Title
Colorado River Storage project Construction and Investigation Activities
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />COLORADO RIVER STORAGE PROJECT <br /> <br />. <br /> <br />CENTRAL UTAH PARTICIPATING PROJECT <br /> <br /> <br />Location and description: The Central Utah project, Initial Phase, will be <br />constructed in the Bonneville Basin in east-central Utah and in the Uinta <br />River Basin, a tributary of the Colorado in northeastern Utah. This multiple- <br />purpose proj ect will provide irrigation water to about 28,540 acres of new <br />land, a supplemental supply for about 132,000 acres, and furnish about " <br />49,000 acre-feet of municipal water. Principal features of the proj ect aJl~ <br />Strawberry aqueduct, ,Strawberry reservoir enlargement, powerplants witfi <br />combined installed capacity of 61,000 kilowatts, and other regulating <br />reservoirs, aqueducts, canals, and distribution systems. The initial phase <br />of this comprehensive development will also provide flood control, re9rea- <br />tion and forest resource development. The Vernal unit is now under <br />construction. <br /> <br />Irrigated Acreage <br /> <br />New land <br />Supplemental <br />Total <br /> <br />28,540 <br />131,840 <br />160, 380 <br /> <br />Principal Agricultural Production <br /> <br />'I <br /> <br />. <br /> <br />Alfalfa, grain, fruit, vegetables, sugar beets, tomatoes - dairy cows, <br />beef cattle and sheep. <br /> <br /> <br /> Water Supply <br /> Average annual increase in supply. (Acre-feet) <br /> Uinta Bonneville <br /> Purpose Basin Basin <br /> Irrigation <br /> Cirect flow none <br /> Return flow and salvage 31,500 <br /> Storage yield 97,500 <br /> Subtotal 46,200* 129,000 <br /> Municipal and Industrial <br /> Direct flow none <br /> Storage 44,300 <br /> Subtotal 4,500* 44,300 <br /> Proj ect Summary <br /> Direct flow none <br /> Return flow and salvage 31,500 <br /> Storage yield 141, 809 <br /> Total 50,700* 173,3QO <br />. Stream depletion (Colo. River) 47,600 141,800 <br /> <br />*Water supplied by direct flow and storage. <br />-44- <br /> <br />Total <br /> <br />1 is, 000 <br /> <br />48,800 <br /> <br />224,000 <br /> <br />189,400 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.