Laserfiche WebLink
<br />ALTERNATIVE 11 <br />COMBINED MAINSTEM STORAGE <br /> <br />~ <br />" <br />~, <br />" <br /> <br />This alternative includes both pro- <br />posed upstream and downstream <br />mains tern storage projects (Alterna- <br />tives 2 and 8), Upper mainstem stor, <br />age would allow for deliveries of an <br />estimated 30,800 acre-feet for munici- <br />pal use. Downstream mainstem stor- <br />age would result in deliveries of 93 ,000 <br />acre-feet per year. The combination of <br />both of these proposed reservoirs <br />would result in deliveries totaling <br />123,800 acre-feet. <br /> <br />Evaluation <br /> <br />The market-valued outputs of this <br />alternative would be irrigation water, <br />municipal and industrial water. hydro- <br />electric power and flood protection, <br />Net annual economic benefits are esti- <br />mated to be $33.2 million, This <br />amounts to a5.2 percent rate of return <br />on the estimated required investment <br />of $636 million, <br /> <br />Development of these storage pro- <br />jects could result in the expansion of <br />the employment sector and the subse- <br />quent expansion of government and <br />services, Flood control benefits would <br /> <br />I \ \." ~ <br />-~:~,.n-" '" CH~mm <br />C"EEK J!t:.jJ -'-.r~ <br />C~mIfLD ~\ -, <br />iW~K~l (2)1 <br /> <br />, ~ ~.~' i <br />'~r j <br />),,\ /'. ( <br />-." ~~~ <br /> <br /> <br />I <br />I <br />( <br />CHII~""'N <br />LAIC( <br /> <br />ALTERNATIVE 12 <br />CONJUNCTIVE SURFACE <br />WATER/GROUND WATER USE <br /> <br />Two plans for the conjunctive use of <br />surface and ground water were consi- <br />dered: the lower South Platte River <br />system and the Beaver-Badger sys- <br />tem, The two systems have been <br />assumed to deliver a total of 129,000 <br />acre, feet annually, <br /> <br />Many senior water right users in the <br />South Platte River basin presently <br />suffer injury due to the pumping of <br />alluvial ground water by wells with jun- <br />ior rights that were constructed prior <br />to Colorado's water rights administra- <br />tion system in 1969, These senior <br />water users have developed a water <br />management plan in order to supple- <br />ment surface water use with potential <br />high capacity wells, Their plan would <br />be facilitated by a downstream main- <br />stem reservoir approximately one-half <br />the size of the proposed downstream <br />mains tern reservoir (Alternative 8), <br /> <br />The Beaver.Badger Water Conser- <br />vancy District also has formulated a <br />conjunctive use plan for surface water <br />and ground water. The plan would <br /> <br />consist of both surface and subsurface <br />storage, change of a water right to an <br />alternate point of diversion and <br />change of storage rights to an alter, <br />nate point of diversion. <br /> <br />Evaluation <br /> <br />The market-valued outputs of this <br />alternative would be irrigation water. <br />Net annual benefits are estimated to <br />be $2,5 million, This amounts to a 3,2 <br />percent rate of return on the esti- <br />mated required investment of $76 <br />million, <br /> <br />i ,. <br /> <br />I oIARA:ON "~oC' <br /> <br />ICH~A~~~~~~~ <br />"~>..->, <br />1 [' (, .. /MOk' <br />r ,\ ( <br />I f!l. \_ <br /> <br />be achieved with the combined main- <br />stem reservoirs. This alternative could <br />affect fish and wildlife species in the <br />basin, including impacts on migration, <br />patterns and habitat of waterfowl and <br />shore birds, <br /> <br />Assuming that a downstream main- <br />stem reservoir was constructed as <br />part of the lower South Platte conjunc, <br />tive use plan, some regulation of flood <br />flows might be achieved, <br /> <br />With the increased diversion and sub, <br />sequent increase in irrigation. concen- <br />trations of dissolved solids and <br />selected nutrients in the irrigation <br />return flows would tend to change <br />downstream water quality, Impacts <br />would be similar to those of Alterna- <br />tive 8 if a lower mainstem reservoir <br />was constructed. <br /> <br />:!!Y' ~"'~"STE ' ). ~~ S. PLATT' RIVER {lZl I <br />~ ! ~ERLlNG.1 r : <br /> <br />I~::---.l-l ,/ ! ' ! <br />I am" <oc ,.."._V..--- ---1---1----.--1 <br />.,";~:'...OI'CM~ ,..~ .,. ~~~'" ~ <br />\.... ~ lIIP..fcl~........ .A r ' : <br />" - 0 co' .> --> r I , I l <br />':;~ 11 (' .~" ~'''~ Ii. .",- <br />J-" I . ~."~I <br />/ I \ 1,12>, 2)1 !,,~1'''7 I <br />( I ,',1l! R(8EA,VEJl I ~ <br /> <br />" <br /> <br />(." <br />< <br /> <br />11 <br />