My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07613
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:07 PM
Creation date
10/12/2006 2:29:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.300.50
Description
Colorado River Basin Salinity Control Advisory Council
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1989
Author
CRBSC Advisory Counc
Title
1988 Annual Report on the Colorado River Basin Salinity Control Program
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />existing water uses. However, with river flows returning <br /> <br />to levels sufficient only to meet downstream delivery <br /> <br />requirements, it is imperative that the federal agencies <br />~ <br />~ vigorously pursue adequate funding to carry out the <br />CO <br />~ proposed salinity control activities as set forth in the <br /> <br />1987 Review and the 1987 Joint Evaluation Report. <br /> <br />The Council urges Reclamation and USDA to closely <br /> <br />coordinate with the Forum during the preparation of the <br /> <br />Forum's "1989 Annual Progress Report - Water Quality <br /> <br />Standards for Salinity - Colorado River System" to assure <br /> <br />consistency with future water use estimates and salinity <br /> <br />control implementation schedules. <br /> <br />Specific Comments <br /> <br />Current status of all the salinity control measures <br /> <br />are discussed in the 1988 Annual Progress Report and the <br /> <br />1988 Joint Evaluation Report. Therefore, the Council will <br /> <br />only offer comments and recommendations on specific <br /> <br />projects which are of concern to the Council. <br /> <br />Bureau of Reclamation <br /> <br />Paradox Valley Unit. The Council is pleased with the <br /> <br />completion of the test injection well and the brine <br /> <br />pipeline. Construction of the surface facilities <br /> <br />connecting the brine collection wells and treatment system <br /> <br />to the injection well will continue through early summer <br /> <br />with brine injection testing to begin by late summer 1989. <br /> <br />-5- <br /> <br />~- ~.' <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.