My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07613
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:07 PM
Creation date
10/12/2006 2:29:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.300.50
Description
Colorado River Basin Salinity Control Advisory Council
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1989
Author
CRBSC Advisory Counc
Title
1988 Annual Report on the Colorado River Basin Salinity Control Program
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l-" ' <br />-J.' <br />00 <br />CO <br /> <br />The USGS provides data on a number of stations on the <br /> <br />river. Reclamation, using data from the USGS, evaluates <br /> <br />the data to provide the states, local entities, and the <br /> <br />Forum with time sensitive information on the River's water <br /> <br />quality. However, at Hoover Dam, water quality analyses <br /> <br />are not processed in a timely manner. Results of the <br /> <br />laboratory analyses are not reported to Reclamation for <br /> <br />periods of over a year. The USGS needs to improve its <br /> <br />procedures so that information on the Hoover Dam station <br /> <br />can be reported in a timely manner. <br /> <br />DeDartment of Agriculture <br /> <br />The Council urges the Department of Agriculture (USDA) <br /> <br />to diligently pursue adequate line item funding for <br /> <br />personnel, equipment, and cost sharing to assure that <br /> <br />program implementation schedules are met. USDA should <br /> <br />insure an adequate, balanced staff for on farm salinity <br /> <br />control activities to better service requests and reduce <br /> <br />the backlog of applications for planning assistance on the <br /> <br />CRSC contracts. <br /> <br />Uinta Basin Unit. Progress on the implementation of <br /> <br />onfarm measures in this area in Utah has been most <br /> <br />encouraging, particularly the large number of contract <br /> <br />signings under CRSC as well as the local participation. <br /> <br />The success of the program can be measured in terms of the <br /> <br />degree of participation by the local community, the <br /> <br />magnitude of the salt load reduction, and the obligation of <br /> <br />-12- <br />
The URL can be used to link to this page
Your browser does not support the video tag.