Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />21)': rJ <br />J..i.(;" <br /> <br />2. LAKE HENRY <br /> <br />. No identified problems or improvements requirement at this time <br /> <br />3, LAKE MEREDITH <br /> <br />. Sediment buildup behind the Lake Meredith Inlet Measuring Device <br />should be evaluated and checked for accuracy, <br />. Prepare more detailed property ownership maps to better assess the need <br />for acquisition of additional property for the reservoir enlargement based <br />on the results and recommendations in Section V, <br />. Revise Bob Creek alternate delivery route if recommended reservoir <br />enlargement stage is higher than 4260-ft, msl. <br /> <br />4. LAKE MEREDITH OUTLET CANAL <br /> <br />. Prepare documents for the Holbrook Siphon rehabilitation and conduct <br />said improvements <br />. Sediment buildup behind the Lake Meredith Outlet Measuring Device <br />should be evaluated and checked for accuracy, <br />. A hydraulic review of the Lake Meredith Outlet Canal should be <br />conducted to better determine operational constraints and opportunities, <br /> <br />B. ROCKY FORD DELIVERY SYSTEM <br /> <br />The Lake Meredith Reservoir enlargement is expected to create greater opportunities <br />for its use if other interest and canal companies, particularly those that are senior to <br />Colorado Canal, can store and release their rights from Lake Meredith, This <br />opportunity also creates greater water turn over in the reservoir thereby helping to <br />maintain and possibly enhance the reservoir's water quality, <br /> <br />URS Greiner <br /> <br />Page 3 <br />