My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07393
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:05:23 PM
Creation date
10/12/2006 2:18:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence-Federal Agencies
Date
4/8/1949
Author
BOR
Title
DOI BOR Region 4 Regional Planning Engineer's Monthly Progress Reports
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Yampa DivisionL .colorado <br /> <br />Cross Mountain Unit. Foundation drilling on Cross Hountain <br />Damsite was complete. Testing of construction materials for this <br />site was continued.' <br /> <br />Gunnison Division, Colorado <br /> <br />Curecanti Unit. Testing of samples of eonstruction mat~rials <br />for Blue Mesa Dam site was continued. <br /> <br />Austin Unit. The drill was moved from Cros'S M01,1ntain Dam site <br />on the Yampa Rh"er to t.he Austin Dam site on the Gurmison R1:ter and <br />operations were started. <br /> <br />Whitewater Unit. <br />potential Kahnah Creek <br />recomTrcndations of the <br /> <br />Preliminary designs and estimates on the <br />Can"l were revised in acc"rdance with the <br />Chief Engineer. <br /> <br />Middle River Division, Arizona-Colora.do-Utah <br /> <br />The level line tie-in ~etween a U.S.C. & G.S. bench mark and <br />t.he Bureau of Ftec.lamation brass caps set last May in the vidnity <br />of Rainbow Bridge was completed. P0wer operation studies for maxi- <br />mum firm power production using a 30,000,000 a.f. reservoir under <br />present modified flow3 with and without Echo Park regulation were <br />completed. A study using ultirr,ate flows with system regulation and <br />the same reservoir capacity was initiated. <br /> <br />Yampa River Project, Colorado-Utah-Wyoming <br /> <br />Little Snake Division, Colorado-Wyoming <br /> <br />The topographic rrapping of Savp.ry Dan sitp. was started,ann <br />tail water surveys belOl.' Savery Dam site were completed. The col- <br />l.ecticr, of design data required for preliminary designs on the <br />dams was started and preliminary designs and estimates on the Dolan <br />Mesa Canal were completed by the area office except for two small <br />chutes and the lateral sJ'stem. <br /> <br />~ <br />O'l <br />N <br />~ <br /> <br />Materials explorations for Savery Dam site were completed. <br />Geologic studies are co~plete except for the testing of materials <br />and writ-ing the appendix. <br /> <br />Collection of records, water requirement, water supply, <br />and _ter rights studies were carried on with studies on Savery <br />Creek being given part.icular at.tention. Preliminary spillway <br />design flood studies on Savery and Slater Creeks were resumed <br />in the area office. Development and settlement, present. economy <br />and anticipated economy studies were resumed, <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.