My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07393
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:05:23 PM
Creation date
10/12/2006 2:18:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence-Federal Agencies
Date
4/8/1949
Author
BOR
Title
DOI BOR Region 4 Regional Planning Engineer's Monthly Progress Reports
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />UNITED STATES <br />DEPARTMENT OF THE INTERIOR <br />BUREAU OF RECLAMATION <br />~~on 4 <br />Fo~t OffIce Box 360 <br />Salt Lake City 8, Utah <br /> <br />October 7, 1949 <br /> <br />This report summarizes progress made on investigations in Colorado <br />during September 1949. <br /> <br />(1) Pr0gress of Investigations <br /> <br />(a) New investigations proposed: None <br />(1:,) Revision of current progr=: None <br />(c) Progress of current investigations (detail listing follows): <br /> <br />Colorado River Storage Pro~ect, Colorado-New Mexico-Utah-Wyoming <br /> <br />Designs and Estimates appendices of the interim report were reviewed <br />and discussed in the Chief Engineer's office in Denver with an engineer <br />from the regional office and one from the area office. Reconrnended revi- <br />~ions and additions are being incorporated into current designs and cost <br />est~~tes for e&ch project unit. Plans of the Colorado River Storage and <br />Central Utah projects were presented to interested water Users at Roose- <br />velt, Price, Salt Lake City, and Nephi, Utah. Cost estimate and payout <br />schedules fer Gunnison River plants were prepared for similar meetings in <br />Colorado early in October. Monthly Gunnison Tunnel diversions were <br />extended to include the 19J1-1948 ~eriod of study 50 that power production <br />at Crystal Unit could be ascertained under existing conditions of flow. <br />Combined system operatiorl studies were continued. Considerable investiga- <br />tion of Gunnison River units operating individually or together but separate <br />from other storage project units was made for purposes of comparison during <br />the hearings in Colorado early in October. <br /> <br />Green Division, Colorado-Utah-Wyoming <br /> <br />"~ <br />dl <br />"-:J <br />''.1' <br /> <br />Flaming Gorge Unit. Topographic mapping of the construction <br />camp site on a scale of Iff = 400' and a contour interval of 5 feet <br />was completed. Rcugh preliminary designs and estimates were revised <br />for the Ashley Dam site and repayment studies were made. Prepara- <br />tion of maps of the Ashley Dam site was continued. Geologic <br />inspection of the dam site was made by a geologist from the <br />regional office. Preliminary location of drill holes were staked <br />and drilling operations were be~~n. <br />
The URL can be used to link to this page
Your browser does not support the video tag.