My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07357
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:55 PM
Creation date
10/12/2006 2:16:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8410.300
Description
Platte River Basin - Basin Multistate Organizations - Missouri Basin States Association
State
CO
Basin
South Platte
Water Division
1
Date
1/29/1962
Author
Unknown
Title
Proposal for Firming the Federal Hydroelectric Plants Serving Preference Customers in the Eastern Division - Missouri River Basin Project - Report and Summary
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />I <br />! <br />~. <br />I <br />I <br />, <br />i <br />~. <br />I <br />I <br />; <br /> <br />0'"'''' ' <br />J(..:Jd' <br /> <br />'~ <br /> <br />The Honorable Stewart L. Udall <br /> <br />-8- <br /> <br />January 29, 1962 <br /> <br />Such thermal generated electric energy so delivered to the United States <br /> <br />shall be generated by the most economical generating units in the Firming <br /> <br />Thermal Systems after generation by such units of the requirements of <br /> <br />the customE!rs of the Firming Thermal Systems at generator loadings and <br /> <br />transmission facility loadings in accordance with good operating practice. <br /> <br />Contract Provisions <br /> <br />The Contract shall include pr~visions as set forth in the aforesaid Proposal <br /> <br />and Statement of Purpose and Intent and such other provisions as may 'be mutually, <br /> <br /> <br />agr<;>ed upon, and in addition shall contain provisions substantially as follows: <br /> <br />1.. The Firming Thermal Sy!,\tems will designate a Thermal System . <br /> <br />Energy Coordinator who will re:present the Thermal Systems in energy <br /> <br />and monetary transactions with the United States under this Contract. <br /> <br />The Thermal System Energy Coordinator will schedule the supply and <br /> <br />exchange of electric energy with the designated representative of the <br /> <br />United States and will administer the energy transactions between the <br /> <br />Thermal Systems including the necessary accounting. <br /> <br />2. Each year, in advance of the navigation season, the Bureau <br /> <br />shall furnish the Thermal System Energy Coordinator with an estimate <br /> <br />of the energy available to the hydro system and the load requirements <br /> <br />of its customers for each navigation season and non-navigation season <br /> <br />for the following four years. <br /> <br />3. All day-to-day deliveries of elect~ic energy between the <br />
The URL can be used to link to this page
Your browser does not support the video tag.