My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07357
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07357
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:55 PM
Creation date
10/12/2006 2:16:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8410.300
Description
Platte River Basin - Basin Multistate Organizations - Missouri Basin States Association
State
CO
Basin
South Platte
Water Division
1
Date
1/29/1962
Author
Unknown
Title
Proposal for Firming the Federal Hydroelectric Plants Serving Preference Customers in the Eastern Division - Missouri River Basin Project - Report and Summary
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"'<::~~.>- <br /> <br />~i:tf~ <br /> <br />0023(10 <br /> <br />The Honorable Stewart L. Udall <br /> <br />-7- <br /> <br />January 29, 1962 <br /> <br />approximations of the present estimates of such deficiencies as <br /> <br />shown in the following tabulation: <br /> <br />Hydro Year <br /> <br />(4)Deficiencies in Hydro Energy Supply <br />(Millions of Kilowatt-Hours) <br />(l)Average Hydro (2)Adverse Hydro <br /> <br />1965-66 453 ~ <br />1966-67 422 919 <br />1967-68 590 870 <br />1968-69 765 1,444 <br />1969-70 958 2,055 <br />(3)1.970-71 & Beyond 1,000 2,200 <br /> <br />(1) <br />(2) <br />(3) <br />(4) <br /> <br />Non-navigation season deficiencies <br />Combined navigation and non-navigation season deficiencies <br />Estimated deficiencies based on 1,850 row load at normal <br />Preference Customer load pattern <br />These deficiencies were derived from data provided by <br />the Bureau <br /> <br />Such deliveries, shall be made in accordance with schedules <br /> <br />for such deliveries as provided in the Contract. The Firming <br /> <br />Thermal Systems shall debit the United States in the Banked <br /> <br /> <br />Energy Account 100 kwh for every 85.kwh of thermal generated <br /> <br />electric energy so delivered. <br /> <br />2. During any hydro year when Banked Energy credit of the United <br /> <br />States is exhausted the Firming Thermal Systems shall deliver to the <br /> <br />United States additional thermal generated electric energy as required <br /> <br />to satisfy the aforesaid deficiencies and the United States shall <br /> <br />reimburse the Firming Thermal Systems for, such energy at incremental <br /> <br /> <br />fuel costs for the delivery of such energy plus 15% to cover other costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.