My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07346
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:05:49 PM
Creation date
10/12/2006 2:16:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Gunnison-Arkansas Project
State
CO
Water Division
4
Date
6/1/1948
Author
US DoI BoR
Title
Interim Report Gunnison-Arkansas Project Colorado Appendix C Designs and Estimates
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />-, <br /> <br />14.25 <br /> <br />-e <br /> <br />CI.?;,tie.l D~V_S}_O_1)"18~,'") <br /> <br />to a junction with the South Side Collecti or, SJ'stem 1.7 mil9s from the <br />west porte.l of t h9 Ft"yinl;rm-ArkS11SE>.S :':,mLe:.. The system vc,rying in <br />capacity from 200 to 400 second"fe0t would intercapt runoff fram the <br />tributaries on the north sidA of th'3 F':,~(r~,;lJar.. :K'j'~r. '.L}:3 crPlr.luit3 <br />would be cOYln,?/}":;pd ty t'l::.J.r!81::; -.vl1p.r,=, '.;hs tSI'J"aL:-1 5.'; n::-,:. SLli~;~bl3 f0l" con- <br />duit corstructiop., <br /> <br />Cut and cova):' copjui:t features <br /> <br />Leng'l;,~ J ~ ~ ~ . . <br />TJ'pe of sections_ <br />Capacity. . <br />Slopa . . . . . . <br /> <br />. <br />, <br /> <br />9(,4 mi,. <br />cone rete <br />200..400 sec, -ft. <br />7.92 f't ,/,"i, <br /> <br />-- , <br />---- <br /> <br />"- ---- <br />-------- <br /> <br />- - - - - <br />------ -------- - <br /> <br />- <br />---- .----.---.---.---- <br /> <br />----- <br />------- <br /> <br />c,~. -, -:=-=C---, --~TiTIfue,Ffeat-ure s= - ~ ~., ,'~, ~ ~ - '- <br /> <br />------- -.. <br />_n <br /> <br />--'- -- - -- --. .--- -- ----- -- ---- <br />.__ ___u_._ _. ______ _ __ __ _ ____ __ _. __ _ _ _. _ <br /> <br />~~----~--------~-- - -- <br />----------"- - ----------_..-.......--~--~--------- ------ --- ~_.-.--- <br />. - - - - <br />--------- .------- <br /> <br />.~Len~t"_h.-.-.-.-.:....-.-. -.:-.-.-.-4. 4-mi e- -.....:..,.. -- -.. <br />-Dia:7leter. . . .3 G ft.. to B~5 ft. <br />Capacity. . . 200..4CO sec.-ft. <br />Slope... . . 5.28-9.21 rt./mi. <br /> <br />e <br /> <br />South Side Collection System <br /> <br />This system would begin Y/ith an intorception of t CD North f'ork of <br />Hunter Creek at elevation 10,700 feet 2,nd a tun",el 2.3 miles long from <br />this point to Chapman Gulch, About 2-1/2 mile 5 below the mouth of this <br />tunnel e. seco"d tunnel would be constructed in two sections from a <br />point on Chapman Gulch at elevation 10,050 feet to the South Fork of <br />the Fryingpan River where an 'interception would be made, "'1d thence to <br />the southwest s'ide of the Fryingpan River. A 2,600 foot siphon would <br />be constructed from the tun'Jel across the Fryingpan >livor to " junction <br />point with the North Side Collection System 1.7 miles from the vlCet por- <br />tal of tho' Fryingpan-Arkans as Tunno1. From thi s point a cut and covor <br />conduit would bo constructed for tho convoyance of up to 800 second-fuet <br />or wall"r to tho Fryingpan-Arkansas Tunnol, <br /> <br />Most of thu m:;tcrial to be oncounturcd is igneous in naturG. <br />thoro has boon no drilling on tho tunnol lines, it is o.ssumcd that <br />tunnols v~uld bo 50 percont supportod and fully concroto-linod, <br />---e- ---,---- <br /> <br />As <br />the <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.