My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07346
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:05:49 PM
Creation date
10/12/2006 2:16:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Gunnison-Arkansas Project
State
CO
Water Division
4
Date
6/1/1948
Author
US DoI BoR
Title
Interim Report Gunnison-Arkansas Project Colorado Appendix C Designs and Estimates
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-.-1'42'4-- <br /> <br />(Initial Dsvelonment) <br /> <br />The reservoir would bo croated by an earth and roclc-fil1 dam about <br />265 foet in height and ~Iould inundate an area of 9.750 acres. The total <br />storage capacity would be 845.000 acre-foot. Construction of tho dam <br />would nccossitato the relocation of tho railroad outsido of tho rosorvoir <br />area. <br /> <br />Goologic featuros of the aroa aro oxposed and simp1o. It is believed <br />that the reservoir aroa and abutments would be tight. Suitable pervious <br />and impervious materials exist in the area. <br /> <br />A canal would be constructed from the reservoir northward to servo <br />the irrigated area 1n the vicinity of Pa1isado, thereby furnishing roplace- <br />ment te that area for the wator diverted from the Fryingpan Basin to tho <br />Eastern Slopo. <br /> <br />=_-C' ,. =-=:: :::==Tho=roi'-er:v:oi,r";and~can"L arcdii~:privato ,OWncr,ship.,and"SJa:1i'()~~azi~g"":",,,~ <br />_~ ~c.:-:: _:~ :~rand.--and-1l.0_~d,i'f.~:i'OUHJT=sliO\lJ.'d,=~-'onc:.~~tercfd."-in'~obta.in1ng=i'i~h~s-of_w~. , - <br />~~~ -:-.); -~~~ ',' ~c:~--;h~;~~i~;:-~s.ttm.~~;~~~~.i"'th~~B~i'd~~~~r't~D~i~~$2~~~i'i~~~~~~~ <br />~_' _, ,c _ , ,. -tJi.e-,c.anil1::$3:;5()O:;000~-a.::.total_or$26';51l:;~Qd~ . Part-of-thrs=C08t~u:i:~1fo"'':::'- <br />char'geable to rep1aceDlCnt and -tRe remaindor would be paid'by'oth.r'~moans. <br /> <br />-,- <br />---. <br /> <br />. <br /> <br />About 3 yoars would bo roquirod for tho comp10tion of the Bridgeport <br />Roservoir and canal. <br /> <br />North Sido Col10Cyion SYstem <br /> <br />This collection system would begin at about elevation 10,125 feet <br />en the North Fork of tho Fryingpan River. Three series of cut and cover <br />conduits would be constructed from this point a distance of 13.8 miles. <br /> <br />-.'._- <br /> <br />9b <br />
The URL can be used to link to this page
Your browser does not support the video tag.