My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07341
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07341
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:51 PM
Creation date
10/12/2006 2:16:00 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - US DOI-BOR - Region 4
State
CO
Basin
Statewide
Date
4/1/1970
Author
DOI-BOR
Title
Report by the BOR to the CWCB - Region 4
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />n /' ^' 'I. " <br />. d ( L;"" <br /> <br />. <br /> <br />. <br /> <br /> <br />Do BONNEVILLE UNIT, CENTRAL UTAH PROJECT <br /> <br />1. STARVATION DAM WAS COMPLETKD AND WATER STORAGE BEGAN IN <br />NOVEMBER 1969--50,000 ACRE-FEET--APRIL 1, 1970 <br /> <br />2. SEAL COAT IN SUMMER WILL COMPLETE HIGHWAY 40 RELOCATION <br /> <br />3. WATER HOLLOW TlmNEL HOLED THROUGH MARCH 12, 1970. TUNNEL <br />LINING WILL BE COMPLETED BY THE END OF 1970 <br /> <br />4. IF FUNDS PERMIT, CONTRAGr WILL BE AWARDED THIS YEAR FOR <br />SOLDIER CREEK DAM <br /> <br />5. CONSTRUGrION BEGAN EARLY IN 1969 ON BOTTLE HOLLOW DAMS AND <br />DIKE. IS SCHEDULED FOR COMPLETION IN LATE 1970. WATER FOR <br />BOTTLE HOLLOW WILL BE OBTAINED FROM EXISTING INDIAN BENCH <br />CANAL. O&M WILL BE RESPONSIBILITY OF UTE TRIBE AND BUREAU <br />OF INDIAN AFFAIRS. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.