My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07341
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07341
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:51 PM
Creation date
10/12/2006 2:16:00 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - US DOI-BOR - Region 4
State
CO
Basin
Statewide
Date
4/1/1970
Author
DOI-BOR
Title
Report by the BOR to the CWCB - Region 4
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I"l'jH.J ;,; (I <br />~J til..l ' <br /> <br />. <br /> <br />. <br /> <br /> <br />POWER OPERATIONS <br /> <br />I . POWER REQUIREMENTS AND SUPPLY <br /> <br />A. POWER NEEDS TO OUTSTRIP CRSP GENERATION THIS WATER YEAR BY <br />OVER 600 MILLION KWH <br /> <br />1. HOOVER DEFICIENCY PURCHASES REPRESENT 150 MILLION KWH <br />(OTHER PURCHASES REQUIRED FOR FIRM POWER LOADS) <br /> <br />2 . 300 MILLION KWH TO BE OBTAINED FROM REGION 6 OVER LIMITED <br />CAPACITY TRANSMISSION TIES <br /> <br />3. 300 MILLION KWH TO BE PURCHASED WHEREVER AVAILABLE-- <br />POSSIBLY PRIVATE POWER COMPANIES IN NEW MEXICO, COLORADO, <br />OR UTAH <br /> <br />4. NO EXCESS ENERGY AVAILABLE FROM SOUTHERN DIVISION <br /> <br />B. NO IMPROVEMENT EXPECTED IN YEARS TO COME <br /> <br />1. WHEN RELEASES FROM GLEN CANYON CAN DROP BELOW 8.8 MILLION <br />ACRE-FEET PER YEAR (AFTER SEPTEMBER 1972), CRSP REQUIRE- <br />MENTS TO PURCHASE ENERGY WILL INCREASE <br /> <br />2. INCREASED WATER SUPPLIES COULD LESSEN OBLIGATION TO PUR- <br />CHASE ENERGY <br /> <br />II. CRSP POWER RESOURCES AND MARKETING <br /> <br />A. ALL NORTHERN DIVISION PREFERENCE CUSTOMERS TO BE SUPPLIED <br />REQUIREMENTS THROUGH WINTER 1975-76 <br /> <br />1. ALL COMMITMENTS ARE EQUAL TO OR GREATER THAN PROBABLE <br />CRSP CAPACITY DURING SUMMER SEASONS STARTING WITH SUM- <br />MER 1971 <br /> <br />2. REGION 6 POWER WILL BE USED TO MAKE UP DIFFERENCE <br />BETWEEN CRSP CAPACITY AND OBLIGATION <br /> <br />B. PREFERENCE CUSTOMERS HAVE REQUESTED ADDITIONAL POWER (ABOVE <br />CONTRACT AMOUNTS) FROM 120 MEGAWATTS IN 1970 TO OVER 300 <br />MEGAWATTS IN 1975 <br /> <br />1. 120 MEGAWATTS TO BE SUPPLIED SUMMER 1970 FROM CRSP AND <br />REGION 6 <br /> <br />2. 80 MEGAWATTS (OUT OF REQUESTED 155 MW) NEEDED FOR SUMMER <br />OF 1971 MAY BE SUPPLIED <br /> <br />3. NO FIRM COMMITMENTS FOR ADDITIONAL POWER MADE BEYOND 1970 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.