My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07341
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07341
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:51 PM
Creation date
10/12/2006 2:16:00 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - US DOI-BOR - Region 4
State
CO
Basin
Statewide
Date
4/1/1970
Author
DOI-BOR
Title
Report by the BOR to the CWCB - Region 4
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />fl [j H;!I ~ <br /> <br />. <br /> <br />. <br /> <br /> <br />CONSTRUCTION PROGRESS <br /> <br />I. GLEN CANYON, FLAMING GORGE, AND NAVAJO UNITS COMPLETED <br /> <br />II. IN CURECANTI UNIT, BLUE MESA AND MORROW POINT DAM! FINISHED <br /> <br />A. MORROW POINT COMPLETION CONTRACTOR 65% FINISHED <br /> <br />B. CURECANTI-MORROW POINT 13.8-KV TRANSMISSION LINE ENERGIZED <br />JANUARY 31, 1970 <br /> <br />C. LAMINATIONS FOR THE ROTOR FOR GENERATOR NO.1 AT MORROW POINT <br />ARE STACKEDo BOTH HALVES OF THE STATOR ARE IN PLACE. GROUTING <br />LEFT ABUTMENT IS COMPLETED. <br /> <br />D. AIM IS TO PRODUCE POWER AT MORROW POINT THIS FALL (DELIVERY <br />OF UNDERGROUND CABLE IS LIMITING FACTOR) <br /> <br />E. SPECIFICATIONS FOR CRYSTAL DAM AND POWERPLANT TO BE ISSUED IN <br />LATE 1970 <br /> <br />III. PARTICIPATING PROJECTS <br /> <br />A. SILVER JACK DAM (BOSTWICK PARK PROJECT) IS 84% COMPLETE <br /> <br />1. THE DAM CONTAINS 540,000 CY OR 40% OF THE 1,300,000 CY <br />NEEDED FOR DAM <br /> <br />2. WORK WILL BE RESUMED WHEN SNOW MELTS NEXT SUMMER <br /> <br />3. STORAGE OF WATER SHOULD BElJIN END OF 1970 IRRIGATION <br />SEASON <br /> <br />4. CONSTRUCTION OF VERNAL MESA DITCH DELAYED UNTIL LATE IN <br />1971, AND LYTLE AND BOSTWICK LATERALS DELAYED UNTIL EARLY <br />1972 BY FUNDS RESTRICTION <br /> <br />B. SUBSmENCE OF LAND AT HAMMOND PROJECT HAS CEASED AND CANAL <br />BANK REBUILDING, CANAL LINING, AND DRAINAGE CONSTRUCTION TO BE <br />PERFORMED IN NEXT 3 YEARS. REPAIR OF FLOOD DAMAGE TO BE COM- <br />PLETED BY IRRIGATION SEASON. <br /> <br />C. MEEKS CABIN DAM (LYMAN PROJECT) SCHEDULED FOR COMPLETION IN <br />LATE 1970. REPAIRS TO OUTLET WORKS CONDUIT WILL BE COMPLETE <br />THIS SUMMER <br /> <br />1. FUNDS RESTRICTION WILL DELAY START OF CHINA MEADOWS DAM <br />UNTIL 1972 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.