<br />fl [j H;!I ~ <br /> <br />. <br /> <br />. <br /> <br /> <br />CONSTRUCTION PROGRESS <br /> <br />I. GLEN CANYON, FLAMING GORGE, AND NAVAJO UNITS COMPLETED <br /> <br />II. IN CURECANTI UNIT, BLUE MESA AND MORROW POINT DAM! FINISHED <br /> <br />A. MORROW POINT COMPLETION CONTRACTOR 65% FINISHED <br /> <br />B. CURECANTI-MORROW POINT 13.8-KV TRANSMISSION LINE ENERGIZED <br />JANUARY 31, 1970 <br /> <br />C. LAMINATIONS FOR THE ROTOR FOR GENERATOR NO.1 AT MORROW POINT <br />ARE STACKEDo BOTH HALVES OF THE STATOR ARE IN PLACE. GROUTING <br />LEFT ABUTMENT IS COMPLETED. <br /> <br />D. AIM IS TO PRODUCE POWER AT MORROW POINT THIS FALL (DELIVERY <br />OF UNDERGROUND CABLE IS LIMITING FACTOR) <br /> <br />E. SPECIFICATIONS FOR CRYSTAL DAM AND POWERPLANT TO BE ISSUED IN <br />LATE 1970 <br /> <br />III. PARTICIPATING PROJECTS <br /> <br />A. SILVER JACK DAM (BOSTWICK PARK PROJECT) IS 84% COMPLETE <br /> <br />1. THE DAM CONTAINS 540,000 CY OR 40% OF THE 1,300,000 CY <br />NEEDED FOR DAM <br /> <br />2. WORK WILL BE RESUMED WHEN SNOW MELTS NEXT SUMMER <br /> <br />3. STORAGE OF WATER SHOULD BElJIN END OF 1970 IRRIGATION <br />SEASON <br /> <br />4. CONSTRUCTION OF VERNAL MESA DITCH DELAYED UNTIL LATE IN <br />1971, AND LYTLE AND BOSTWICK LATERALS DELAYED UNTIL EARLY <br />1972 BY FUNDS RESTRICTION <br /> <br />B. SUBSmENCE OF LAND AT HAMMOND PROJECT HAS CEASED AND CANAL <br />BANK REBUILDING, CANAL LINING, AND DRAINAGE CONSTRUCTION TO BE <br />PERFORMED IN NEXT 3 YEARS. REPAIR OF FLOOD DAMAGE TO BE COM- <br />PLETED BY IRRIGATION SEASON. <br /> <br />C. MEEKS CABIN DAM (LYMAN PROJECT) SCHEDULED FOR COMPLETION IN <br />LATE 1970. REPAIRS TO OUTLET WORKS CONDUIT WILL BE COMPLETE <br />THIS SUMMER <br /> <br />1. FUNDS RESTRICTION WILL DELAY START OF CHINA MEADOWS DAM <br />UNTIL 1972 <br /> <br />5 <br />