My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07325
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:47 PM
Creation date
10/12/2006 2:15:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
6/17/1977
Author
Dames And Moore
Title
Proposal Safety review of Foundation and Embankment Narrows Dam, South Platte River Fort Mortan, Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DAMES 8 M~OAE <br /> <br />Mr. Felix L. Sparks <br />June 17, 1977 <br />Page 5 <br /> <br />Site Visit <br /> <br /> <br />The site will be visited and inspected thoroughly by walking the <br /> <br /> <br />area. If deemed necessary, we will charter an aircraft for further <br /> <br /> <br />reconnaissance of the areal geology. The surface materials at the site <br /> <br /> <br />consist of weathered shale outcrops and alluvium. It is not expected <br /> <br /> <br />that a surface reconnaissance will yield much significant geologic <br /> <br /> <br />data but such a site visit is necessary to complement the drill logs <br /> <br /> <br />and published data. Exposed rock outcrops will be inspected for joint <br /> <br /> <br />pattern, joint spacing, width of joints and structure. Spot checking of <br /> <br /> <br />the surface geology maps prepared by the USBR will be performed. <br /> <br /> <br />Particular attention will be paid to the dam abutments and to searching <br /> <br /> <br />for evidence of the presence of sandstones or other pervious formations <br /> <br /> <br />in the area. <br /> <br />The soils at the project site and in the proposed borrow areas which <br /> <br /> <br />are considered potential construction materials will be inspected. <br /> <br />Detailed Evaluation of Subsurface Conditions <br /> <br /> <br />Using data obtained by the USER during their field exploration program, <br /> <br /> <br />a detailed check of the interpretation will be performed. Geologic <br /> <br /> <br />surface mapping and geologic cross-sections of the project site will be <br /> <br /> <br />checked against the drill hole logs and data published by other organizations <br /> <br /> <br />such as the U. S. Geological Survey. The drill cores will be inspected <br /> <br /> <br />if available and the USBR logs reviewed in light of the inspection. The <br /> <br /> <br />right abutment area will be given special attention and the adequacy of <br /> <br /> <br />data to define subsurface conditions at this critical area will be evaluated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.