My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07325
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07325
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:47 PM
Creation date
10/12/2006 2:15:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
6/17/1977
Author
Dames And Moore
Title
Proposal Safety review of Foundation and Embankment Narrows Dam, South Platte River Fort Mortan, Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DAMES 8 MOORE <br /> <br />Mr. Felix L. Sparks <br />June 17, 1977 <br />Page 4 <br /> <br />WORK PLAN <br /> <br />To attain the above objectives, we have developed a plan of approach <br /> <br /> <br />to this study that will result in a defensible final report. It is assumed <br /> <br /> <br />that full cooperation of the USER will be available. It is contemplated <br /> <br /> <br />that field exploration data, laboratory data, reports, working papers and <br /> <br /> <br />computations will be available for our use. Conferences and personal <br /> <br /> <br />contact with USBR personnel will also be required and it has been assumed <br /> <br /> <br />that this will not be a problem. <br /> <br />If, during our review, areas of additional required studies are <br /> <br /> <br />identified, our report will recommend the nature and scope of such studies. <br /> <br /> <br />Performance of such studies is considered outside the scope of this contract. <br /> <br />Our proposed plan of work is presented in the following paragraphs. <br /> <br />Data Collection <br /> <br /> <br />As soon as possible after receiving a notice to proceed, a meeting <br /> <br />will be held with the USER at their offices. The purpose of this meeting <br /> <br /> <br />will be threefold: to receive a general briefing on the project from USER <br /> <br /> <br />personnel; to obtain pertinent dat~, reports and computations; and to <br /> <br /> <br />establish contact with designated USBR personnel in each of the major <br /> <br /> <br />areas to be covered in our study. <br /> <br />General Project Review <br /> <br /> <br />A brief, general review of the project will be performed in order to <br /> <br /> <br />acquaint the Principal Investigators with the geology of the area, the <br /> <br /> <br />construction materials available at the site, and the project concept as <br /> <br /> <br />developed by the USER. <br />
The URL can be used to link to this page
Your browser does not support the video tag.