Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />THOMAS M. LEPS <br /> <br />1959-61 <br /> <br />1961-63 <br /> <br />1963 - <br />Present <br /> <br />Page 2 <br /> <br />Manager of Organization and Procedures, Southern Cal ifornia <br />Edison Co. Directed corporate staff of 26 analysts. Planned <br />and developed improved operation and administration procedures <br />in all departments. Investigated, leased, programmed, and <br />instal led large scale electronic computer (Honeywel I 800) for <br />company's business data processing; directed staff of <br />programmers in development of computer programs for engineering <br />and operating problems. Confidential adviser to senior <br />management on organization planning. <br /> <br />Chief Engineer, Shannon & Wi Ison, Inc., Soi I Mechanics and <br />Foundation Engineers, Seattle. Supervised engineering staff <br />and served as consulting engineer on foundations, earth dams <br />and landsl ides. Prepared overal I review and report on <br />current status of Rock Mechanics. <br /> <br />Consulting Engineer. Special izing in embankment dam design, <br />soi I mechanics, dam safety studies and construction supervision. <br /> <br />Member of Independent Panel to Review Cause of Teton Dam Fai lure. <br />T his was a liB I ue Ribbon" pane I appo i nted by the Depa rtment of <br />the Interior and State of Idaho to investigate the tragic fai lure <br />of Teton Dam. <br /> <br />Team leader for the detailed study for dynamic loading and <br />seismic stabi I ity for four hydraul ic fi I I dams (Lake Alamanor, <br />Crane Val ley, Butt Val ley, and Lake Francis) in Cal ifornia, U.S.A. <br /> <br />Board member for design and construction of the Cal ifornia <br />Aqueduct. Consultant to the Pacific Gas and Electric Co. of <br />Cal ifornia for design and construction supervision of the Helms <br />Creek Pump Storage Project, comprising six mi les of 12.25 meter <br />diameter tunnel and 1050 MW power plant, and on safety of 57 <br />dams. <br /> <br />Co-author of report on detai led safety inspection and review of <br />the Orovi I Ie Dam in California. <br /> <br />Consultant to Southern Cal ifornia Edison Company on the safety <br />of 24 dams. <br /> <br />Special Consultant on the design and supervIsion of construction <br />of the Pantabangan Dam and appurtenant structures in the Phil ippines. <br />The dam is a 115 meter high, 1400 meter long, 9,500,000 cubic <br />