<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br />EDUCATION
<br />
<br />REGISTRATION
<br />
<br />EXPERIENCE
<br />
<br />1936-1941
<br />
<br />1941-42
<br />
<br />1942-43
<br />
<br />1943-46
<br />
<br />1946-59
<br />
<br />I
<br />I
<br />I
<br />
<br />Resume of Professional Qual ifications
<br />of
<br />THOMAS M. LEPS
<br />
<br />1936, Stanford University, A.B. in civil engineering.
<br />1939, M.I.T., M.S. in civil engineering.
<br />
<br />_____1
<br />
<br />Registered professional engineer in California, Oregon,
<br />and Washington.
<br />
<br />Variously with California Division of Highways, Massachusetts
<br />Institute of Technology and U. S. Corps of Engineers as Civil
<br />Engineer and Research Assistant on highways, soi I mechanics
<br />research and design of flood control dams.
<br />
<br />Assistant Civil Engineer, U. S. Bureau of Reclamation,
<br />_ Denver Earth Dams Laboratory, on embankment and foundation
<br />studies. for major earthfil I dams (i.e., Anderson Ranch, Davis,
<br />Horsetooth, Palisades, Medicine Creek, Blackwood Creek).
<br />
<br />Construction Engineer, DeLeuw Cather & Co., on Ordnance and
<br />Ammunition Depots, Nebraska and Oklahoma.
<br />
<br />Officer, U. S. Navy Civil Engineer Corps (Seabees).
<br />of design of Navy Bases and air fields on Hawai i and
<br />Currently Commander, C.E.C. Reserves (Retired).
<br />
<br />In charge
<br />Okinawa.
<br />
<br />Structural Engineer, Senior Civi I Engineer and Chief Civi I
<br />Engineer, Southern California Edison Co. (electric power
<br />uti I ity, Los Angeles). Responsibi I ities included supervision
<br />of field and laboratory investigations, planning estimating,
<br />design preparation, specification writing, evaluation of bids,
<br />and coordination of construction of the fol lowing: Dams,
<br />tunnels, canals, switchyards, substations, steam and hydro
<br />power plants, transmission towers, pipel ines, roads and
<br />buildings; aggregate value about $500,000,000. Construction
<br />included three major earth dams, one concrete gravity dam,
<br />three hydro powerhouses, seven steam-electric stations, industrial
<br />and commercial bui Idings, 400 mi les of 220 kv. transmission line,
<br />hot oil pipel ines and pump stations, submarine pipel ines, and
<br />seawater and fresh-water canals. Supervised staff of 40 to 150
<br />engineers and technicians.
<br />
|