Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />EDUCATION <br /> <br />REGISTRATION <br /> <br />EXPERIENCE <br /> <br />1936-1941 <br /> <br />1941-42 <br /> <br />1942-43 <br /> <br />1943-46 <br /> <br />1946-59 <br /> <br />I <br />I <br />I <br /> <br />Resume of Professional Qual ifications <br />of <br />THOMAS M. LEPS <br /> <br />1936, Stanford University, A.B. in civil engineering. <br />1939, M.I.T., M.S. in civil engineering. <br /> <br />_____1 <br /> <br />Registered professional engineer in California, Oregon, <br />and Washington. <br /> <br />Variously with California Division of Highways, Massachusetts <br />Institute of Technology and U. S. Corps of Engineers as Civil <br />Engineer and Research Assistant on highways, soi I mechanics <br />research and design of flood control dams. <br /> <br />Assistant Civil Engineer, U. S. Bureau of Reclamation, <br />_ Denver Earth Dams Laboratory, on embankment and foundation <br />studies. for major earthfil I dams (i.e., Anderson Ranch, Davis, <br />Horsetooth, Palisades, Medicine Creek, Blackwood Creek). <br /> <br />Construction Engineer, DeLeuw Cather & Co., on Ordnance and <br />Ammunition Depots, Nebraska and Oklahoma. <br /> <br />Officer, U. S. Navy Civil Engineer Corps (Seabees). <br />of design of Navy Bases and air fields on Hawai i and <br />Currently Commander, C.E.C. Reserves (Retired). <br /> <br />In charge <br />Okinawa. <br /> <br />Structural Engineer, Senior Civi I Engineer and Chief Civi I <br />Engineer, Southern California Edison Co. (electric power <br />uti I ity, Los Angeles). Responsibi I ities included supervision <br />of field and laboratory investigations, planning estimating, <br />design preparation, specification writing, evaluation of bids, <br />and coordination of construction of the fol lowing: Dams, <br />tunnels, canals, switchyards, substations, steam and hydro <br />power plants, transmission towers, pipel ines, roads and <br />buildings; aggregate value about $500,000,000. Construction <br />included three major earth dams, one concrete gravity dam, <br />three hydro powerhouses, seven steam-electric stations, industrial <br />and commercial bui Idings, 400 mi les of 220 kv. transmission line, <br />hot oil pipel ines and pump stations, submarine pipel ines, and <br />seawater and fresh-water canals. Supervised staff of 40 to 150 <br />engineers and technicians. <br />