My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07246
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07246
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:26:27 PM
Creation date
10/12/2006 2:12:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agency Reports - BOR
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1978
Title
Reject Stream Replacement Study - Status Report Janaury 1978
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> Table 1 <br /> Probable Water Salvage Potential in the All-American Canal 1/ <br /> Units: acre-feet <br />to Probable Loss Theoretical Loss Est. Savings <br />W From Unlined From Lined With Lined <br />0 Station Canal Canal 2/ Canal <br />--1 <br /> Station 60 to Pilot Knob 60,000 ~/ 14,000 7/ Undetermined !Y <br /> Pilot Knob to Drop 1 57,000 .11 9,000 48,000 <br /> Drop 1 to East Highline <br /> Canal 40,000 ?/ 10,000 30,000 <br /> East Highline Canal to <br /> Central Main Canal 3,300 y 3,300 0 <br /> Central Main Canal to <br /> West Side Main Canal 4,200 y 4,200 0 <br /> <br />. <br /> <br />. <br /> <br />11 <br /> <br />Data extracted from attachment to letter from Area Engineer, San <br />Bernardino, to Regional Director, Boulder City; Subject: Report on <br />Findings of General Investigation (Feasibility), Boulder Canyon Project, <br />All-American Canal System Water Salvage, Imperial Division, California, <br />April 17, 1970. <br /> <br />Losses from lined canals include 0.10 ft/ft2/day seepage loss, plus <br />estimated evaporation loss, plus losses from siphons, except for the <br />last two reaches where the theoretical loss from a lined canal was <br />limited by the probable loss from the unlined canal. <br /> <br />?/ <br /> <br />~/ <br /> <br />Based on Imperial Irrigation District recorded losses for 1965 and 1966, <br />rounded. <br /> <br />1/ <br /> <br />Based on January 1967 ponding test loss, plus evaporation, extended <br />to one year. <br /> <br />~/ <br /> <br />Ten-year average, Imperial Irrigation District provisional records, <br />rounded. <br /> <br />y <br /> <br />Based on January 1966 ponding test loss, plus evaporation and loss <br />from siphons, extended to one year. <br /> <br />II <br />~/ <br /> <br />Includes 50o-acre-foot loss from siphons. <br /> <br />Since some unknown quantity of the present seepage losses returns to <br />the river, the quantity that could be saved by canal lining has not <br />been estimated. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.