My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07142
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07142
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:55 PM
Creation date
10/12/2006 2:06:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
The Colorado Big Thompson Project - Reports
Basin
South Platte
Water Division
1
Date
4/1/1952
Author
Nat'l Park Serv
Title
Planning Report of Recreation Use and Development - Willow Creek Reservoir - CBT Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />1-") <br />~... <br />Ul <br />~ <br />00 <br /> <br />-';}.~ <br /> <br />';"': <br /> <br />Annual visitor days are estimated at 2500. The cost of this <br /> <br />.;:' <br /> <br />development,is estimated at ~~23,000. Annual operation, maintenance and <br /> <br />, <br /> <br />administration costs are estimated at $1500. Initial equipment costs <br /> <br />are estimated at Yl2400. The Bureau of Reclamation is recommended as the <br /> <br />operating, administering and managing agency. <br /> <br />As planned, this reservoir will fluctuate behmen elevations <br /> <br />8112 and 8118 except during the lIDnth of June when elevations as high <br /> <br />as 8130 may be reached. <br /> <br /> <br />III BASIC INFOm~,TION <br /> <br />Willow Creek Reservoir is located in Grand County, Colorado, <br /> <br />on Willow Creek, about two and a half airline miles west of Granby Reservoir. <br /> <br />The prime purpose of the vJillowCreek Reservoir is to serve <br /> <br />as a d:iversion, exporting water from 1fillow Creek to Granby Reservoir <br /> <br />through a canal and pumping plant. The plan of operation provides that <br /> <br />th:is reservoir will regulate flows in excess of pumping plant capacity <br /> <br />of 400 c.f.s. to maintain a water surface elevation of 8116 as much of <br /> <br />the time as possible. The water surface elevation of Hillow Croek <br /> <br />Reservoir will vary between 8112.4 to 8130.0. The surface area will l:ike- <br /> <br />wise vary from 118 acres to approximately 300 acres. In most yoars active <br /> <br />storage above elevation 8118 would bo oxperienced only in June, while during <br /> <br />the remaindor of the year the water surface would probably vary from 8112 <br /> <br />to 8118. The scheduled completion date of the dam is Lpril 1, 1953, and <br />the estimated project cost is $1,389,101. <br /> <br />Prcliminary discussions 1i-Lth the Fish and Wildlifo Sorvice indi- <br /> <br />cate that fishing in the reservoir will be good. It is believed that <br /> <br />stream fishing downstream from the dam may also be good. <br /> <br />3 <br /> <br />. '. ." .- .... :~. .......:, ." ,-" . .",;: .,' -~. -. " ..:. <br />
The URL can be used to link to this page
Your browser does not support the video tag.