Laserfiche WebLink
<br />on 2 2 5 4 Schedule of Proposed Actions (SOPA) - Medicine Bow-Routt National Forests <br />9130/2003 <br /> <br />Project Name District Est./ActUill Seoping Date Expected NEPA Document <br />West Roundup Coal LBA Douglas June.200t EIS I <br /> , <br />Project Type Contact Est./Actual Decision Date ProJect Status , <br />Minerals Management Joanne Homuth; 307-358-4690; jhomulh@1s.fed.us Summer, 2004 Analysis in Progress <br />, Remarks/Description Location <br />Coal lease by application on 580 acres. This aclion is being analyzed as part of the Southern Powder River Basin Oil and T,42N,R.71,72W, <br />Gas EIS. The BlM is the lead agency. The Forest SeNiea is a cooperating agency. <br />Project Name District Est.lActuaJ Seoplng Date Expected NEPA Document <br />linle Thunder Coal LBA Douglas June, 2001 EIS <br />Project Type Contact Est./Actual Decision Date Project Status <br />Minerals Management Joanne Homuth; 307-358-4690; jhomuth@fs.fed.us Summer, 2004 Analysis in Progress <br />Remarks/Description Location <br />Coal lease by application on 640 acres. This action is being analyzed as part of the Southern Powder River Basin Oil and T,43N,R.70-71W, <br />Gas EtS. The BLM is the lead agency. The Forest Service is a cooperating agency. <br />ProJect Name District Est./Actual Scoplng Date Expected NEPA Document <br />Prima Porcupine North & South Tuit CBM Project Douglas April, 2002 EA <br />Project Type Contact EstJActual Decision Date Project Status <br />Minerals Management Mike Sierz; 307-358-4690; mlsierz@fs.fed.u5 April 9, 2003 Project Implementation <br />Remarks/Description Location <br />Prima Q&G Company applica1ion to drill and develop 26 coalbed methane gas wells and ancillary and related facilities. On T.42N.R.72W., sections 23 <br />02112/03, the project decision signed on 11/14/02 was remanded back to the Forest for the purpose of additional analysis and 24 <br />and a new decision. Additional analysis of air Bnd water quality and quantity effects was completed. A new decision was T.43N.R. 72W., sections 13 <br />signed on 4/9/2003. Implementation of this project began after 07/31/2003. and 23-25 <br />Project Name District . EstJActual Scoplng Date Expected NEPA Document <br />Coleman Sioux Ranch GBM Project Douglas June 19, 2002 CE <br />Project Type Contact Est./Actual Decision Date Project Status <br />Minerals Management Mike Sierz; 307-358-4690; mtsierz@ls.led.us Fall, 2003 Decision Pending <br />Remarks/Description Location <br />The application to develop four (4) coalbed methane wells that will require the use of approximately five (5) acres of NFS T.41N.R.72W., section 15 <br />land. <br />Project Name District Est.JActual Scoplng Date Expected NEPA Document <br />Merit Energy South Porcupine CBM Project Douglas June 19. 2002 CE <br />Project Type Contact Est./Actual Decision Date Project Status <br />Minerals Management Mike Sierz; 307-358.4690; mlsierz@fs.fed.us Fall,2003 Analysis in Progress <br />Remarks/DescriptIon Location <br />The application to develop and operate four (4) coalbed methane wells that will require the use of approximately five (5) T.42N.R.71W., section 11 <br />acres of NFS land. <br /> <br />Thesday. Seplernber 30, 2003 <br /> <br />Page 9 <br />