My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07104
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:45 PM
Creation date
10/12/2006 2:05:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa General Publications - Correspondence - Reports
State
CO
Basin
Statewide
Date
10/1/2003
Author
Mary H Peterson
Title
Schedule of Proposed Actions - Medicine Bow-Routt National Forests - Thunder Basin National Grassland - Fourth Quarter - October through December 2003
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />oo2253 <br /> <br />Schedule 01 Proposed Actions (SOPA) - Medicine Bow-Routt National Forests <br />9130/2003 <br /> <br />" <br /> <br />District <br />Douglas <br /> <br />Est./Actual Scoplng Dale <br />Fall,2003 <br />Est./Actual Decision Date <br />Summer, 2004 <br /> <br />Project Name <br />Laramie Peak Distribution Line SUP Renewal <br />Project Type Contact <br />Lands Management Ted Cook; 307-358.4690; tcook@fs.fed.us <br /> <br />. Remarks/Description <br />A application by J&L Leasing to renew the special use permit for a 2.4 mile, 2400 volt distribution power1ine that serves the <br />regional communications site on Laramie Peak. The ROW is and would continue to be 3D-feet wide involving 8.8 acres of <br />NFS land. <br /> <br />District <br />Douglas <br /> <br />EstJActual Seoplng Date <br />February, 2002 <br />EstJActual Decision Date <br />Fall, 2003 <br /> <br />Project Name <br />Yates Petroleum. Duck Cr. Fed. #1 APD <br />Project Type Contact <br />Minerals Management Liz Moncrief, 307-745-2456;emoncrie@fs.fed.us <br /> <br />Remarks/Description <br />A proposal (APD) to drill an exploratory oil well The well would be drilled and developed in en inventoried roadless eree. <br />An EIS is being prepared, An NOI was published and public scoping began during early 2002. <br /> <br />Project Name <br />Big Porcupine CBM Project <br />Project Type <br />Minerals Management <br /> <br />District <br />Douglas <br /> <br />Est.lActual Scoplng Date <br />February, 2002 <br />Est.lActual Decision Date <br />Fall. 2003 <br /> <br />Contact <br />Liz Moncrief, 307-745-2456; emoncrie@fs.fed.us <br /> <br />Remarks/Description <br />Applications to drill 202 coalbed methane gas wells, and develop related facilities on NFS lands. NEPA analysis and <br />documentation is being done by O&G Consultants for the USFS (paid for by Independent). This project was prviously <br />called the "Independent Energy CBM Projecl - 260 Well~. <br /> <br />Project Name District <br />Barrett Resources Thunder Head CBM - 41 Well APDs Douglas <br />Project Type Con1act <br />Minerals Management Leo Carter; 307-358-4690; Icarter@fs.fed.us <br /> <br />EstJActual Scoplng Date <br />July. 2001 <br />EstJActual Decision Date <br />Winter, 2003-04 <br /> <br />Remarks/Description <br />Development of a 41 well coalbed methane field in an area where the federal mineral is being drained by adjacent private <br />wells. The NEPA process analysis and documents are being prepared by Greystone and O&G consultants for USFS (paid <br />by Barrett). Williams Energy /company has pruchased the leases, associated with this project. <br /> <br />Project Name <br />North Antelope/Rochelle LBA <br />Project Type <br />Minerals Management <br /> <br />District <br />Douglas <br /> <br />EstJActual Scoping Date <br />June,2001 <br />EstJActual Decision Date <br />Spring, 2004 <br /> <br />Contact <br />Joanne Homuth; 307-358-4690; jhomuth@fs.fed.us <br /> <br />Remarks/Description <br />Coal lease by application to develop 1,740 acres. This action is beIng analyzed as part of the Southern Powder River <br />Basin Oil and Gas EIS. The BLM is the lead agency. The Forest Service is a cooperating agency. <br /> <br />Expected NEPA Document <br />CE <br />Project Status <br />Prescoping <br /> <br />Location <br />T.26N,R,72W,. section 1.2 and <br />35-36 <br /> <br />Expected NEPA Document <br />EIS <br />ProJect Status <br />Analysis in Progress <br /> <br />Location <br />T.55N.,R.69W.. section 30 <br /> <br />Expected NEPA Document <br />EA <br />Project Status <br />Analysis in Progress ,. <br /> <br />Location <br />T.42N.R.71W., sections 11-13, <br />22.24 and 34-35; <br />T.41N.R.71W., sections 1,3 <br />and 12-13; T.41N.R,70W., <br />section 18; T.42N.R.70W., <br /> <br />Expected NEPA Document <br />EA <br />Project Status <br />Analysis in Progress <br /> <br />Location <br />T.43N.R,71-72W, on TBNG <br /> <br />Expected NEPA Document <br />EIS <br />Project Status <br />Analysis in Progress <br /> <br />Location <br />T.42N,R,70.71W. <br /> <br />Thesday. September 30,2003 <br /> <br />paga 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.