My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07104
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:45 PM
Creation date
10/12/2006 2:05:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa General Publications - Correspondence - Reports
State
CO
Basin
Statewide
Date
10/1/2003
Author
Mary H Peterson
Title
Schedule of Proposed Actions - Medicine Bow-Routt National Forests - Thunder Basin National Grassland - Fourth Quarter - October through December 2003
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002255 <br /> <br />Schedule of Proposed Actions (SOPAl - Medicine Bow-Routt National Forests <br />9130/2003 <br /> <br />'. <br /> <br />District <br />Douglas <br /> <br />Est./Actual Seoplng Date <br />Summer, 2003 <br />Est./Actual Decision Date <br />Spring, 2004 <br /> <br />Project Name <br />Ballard Spring Creek Oil Well, Federal #11-11 <br />Project Type Contact <br />Minerats Management Mike Siarz; 307-358-4690; mlsierz@'s.fed.us <br /> <br />Remarks/Description <br />The application to drill and operate one (1) convenlional oil well that will require the use of less than five (5) acres of NFS <br />land. Notice of staking on site completed - awaiting receipt of the APD to define the project proposed prior to implementing <br />public seoping. <br /> <br />District <br />Douglas <br /> <br />Est./Actual Seoplng Date <br />Summer, 2003 <br />EslJActual Decision Date <br />Summer, 2004 <br /> <br />Project Name <br />Ballard Wildhorse Oil Well, Federal #3-18 <br />Project Type Contact <br />Minerals Management Mike Sierz; 307-358-4690; mlsierz@fs.fed.us <br /> <br />Remarks/DescrIption <br />The application to drill and operate one (1) conventional oil well that will require the use of less than five (5) acres of NFS <br />land. <br /> <br />Project Name <br />Gulf Oil Wells Federal <br />Project Type <br />Minerals Management <br /> <br />District <br />-'14.27 and -#8-28 APDs Douglas <br />Contact <br />Mike Sierz; 307-358-4690; mlsierz@fs.fed.us <br /> <br />EstJAetual Seoping Date <br />Indeterminate <br />EstJAetual Decision Date <br />Indeterminate <br /> <br />Remarks/Description <br />Applications 10 drill, develop and operate two (2) conventional 011 wells on the same well pad. One well will be directional1y <br />drilled. The analysis is on hold pending the results 01 exploration at other nearby proposed and/or planned well sites. <br /> <br />District <br />Douglas <br /> <br />Est.lActual Seoplng Date <br />March 28, 2003 <br />Est./Actual DecisIon Date <br />Winter, 2003-04 <br /> <br />Project Name <br />Yates Thunder Basin CBM Wells POD <br />Project Type Contact <br />Minerals Management Leo Carter; 307-358-4690; Icarter@fs.fed.us <br /> <br />Remarks/Description <br />The drilling, development and operation of ten (10) coal bed methane wells and necessary related facilities on the TBNG. <br />Nine (9) 01 the wells involve Federal minerals and Federal surface; one (1) wett involves Federal minerals and fee (private) <br />surface. The FS will analyze the effects for the one well at the request of the BlM. <br /> <br />Project Name <br />Ridge Road Upgrade <br />Project Type <br />Minerals Management <br /> <br />District <br />Douglas <br /> <br />Est./Actual Scoplng Cate <br />April, 2003 <br />Est.lActual Decision Date <br />Indeterminate <br /> <br />Contact <br />JoAnne Homuth; 307-358-4690; jhomuth@fs,fed.us <br /> <br />Remarks/Description <br />A proposal by Powder River Coal Company to upgrade approximately 590 feet (0.2 acres) of an exisiting two-track road on <br />the Thunder Basin National Grassland to replace part of the Piney Canyon Road that will be mined through. This road <br />upgraded is needed to provide continued future access to KN Energy and Western Gas, pipeline booster stations and <br />producing oil and gas wells in the local area. The analysis is on hold pending resolution of issue(s) regarding the recent <br />identification and existence of a hawk nest along the Ridge Road in the project area. A decison on ths project Is on hold <br />pending receipt of information from the proponent. <br /> <br />Expected NEPA Document <br />CE <br />Project Status <br />Prescoping <br /> <br />Location <br />T.54N.R.70W., section 11 <br /> <br />Expected NEPA Document <br />EA <br />Project Status <br />Prescoping <br /> <br />Location <br />T.54N.R.69W., section 18 <br /> <br />Expected NEPA Document <br />CE <br />Project Status <br />On Hold - Other <br /> <br />location <br />T.41 N.R.68W., section 27 <br /> <br />Expected NEPA Document <br />EA <br />Project Status <br />Analysis in Progress <br /> <br />location <br />T.42N.R.70W., sections 7, 9 <br />and 18 <br />T.42N.R.71W., section 13 <br /> <br />Expected NEPA Document <br />CE <br />Project Status <br />On Hold - Other <br /> <br />Location <br />T.42N.R.70 W., section 18 <br />T.42N.R.71W., sections 12 <br />and 13 <br /> <br />Tuesday. Seplember 30, 2003 <br /> <br />Paga , 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.