<br />pl"nt would be l('cated abollt 5 miles norlh uf Sterling, Cola, The
<br />plH.nt would diyert about 170 cJ.s. of wn.ter fur E:ilOrage -in the North
<br />SterJi~g Resen"oir. ThrtHlgU exchilnge procedures 0,[1 equ(t"ulent
<br />quantity of water would be stored in I.he Narrows Resen"oir for use
<br />by ,Jle entire Lower South Plntte \Vater Consel'nwc\, District.
<br />In additilln to a 5-unit pllmping plant "nd 6,400 feet of 54-inch
<br />di..,charge pipe the ins~allR.tioll wou!d require rehfl.uilitation of t.he
<br />helJ.clworks ann. the init..hJ 1% wiles 0f the existing Lowline CaDal,
<br />3J~ miles of new canal len.ding to the plunt and 2 miles of new cltllal
<br />leading away from the discharge line to the North Sterling inlet cn.nal.
<br />Power frollI tne Bureau of Reclamation's Sterling-Sidney 1l5~
<br />kilo'Volt line would be tru.usrnitted to the pumping {'fant by construc-
<br />tion of 0. Jf-mile trn.nslnission line and. II substatlnn to be locat.ed
<br />u.djo.cent. to the pumping ph-Lilt..
<br />Due to a.ppllTent high investment und. opemting cos!.!, and the luck
<br />ofstor-a.ge cf\pnc.i~y in the Nonh Sterling and Narro\\'s Reservoirs, t,he
<br />plan llppenrs to be inreo.<;ible. rr H.dditional storo.ge capacity could be
<br />develc.pect economically in the 10\\ er busin, further st.uuif'A'; might be
<br />wBrranted,
<br />
<br />Riverside pumping plant
<br />
<br />.~ The computed shortaoe fur the 22,909-acre service a.reH. of t.he
<br />Riverside system a\'erag~s 35,500 fi.cre-feet per year. In un efI'ol.t to
<br />improve t.his critical wuter supply '::jit,lLation, tne Colorn,do Wllter
<br />CODSerHl.t.lOn Board requested that n supplementR.) wat€'r plan Cor
<br />this system be developed. II
<br />A 5-unit pumping plnllt, (~onnected directlv to the riyer outlet,
<br />could be constructed below the Narrows Dam to providp. supplemental
<br />water for the Riverside irrigation system. The tot.Rl dynamic. head
<br />would be 120 feet and the cflpacity of the plant would be J 50 cubic
<br />feet per .econd, A 54-ineh, 4,750-foot-long discharge line would follow
<br />the downstream toe uf the dam, cruss o\'er the spillway chute, and
<br />disc.harge into the existing Ri\"erside Canal nellr the lert. u.but.ment of
<br />NarrO\'\r"s Dam. The discharge line \\'ould be constructed of rcin(orred
<br />concrete except for ll. steel section which \\-'ould extend ucrn"s the ~plll-
<br />way. A surge tank would be required near the middJe llr t.he disC'hllrge
<br />line. Addition of this pumping pln.nt to the unit would require some
<br />modifications at the discharge end of the ch"er outlet works. Power
<br />would be provided by a 3.75-mile, 115-kiloyolt t.fallsmissionline from
<br />lhe existin~ USBR Greeley-Fort Morgan ll5-kilovolt line and" sub-
<br />station in the vicinity of N nrr0'I,,'S Dam site,
<br />~\ By adding this feature, fin Ryerage of Rbout 17,000 ucre-feeL of
<br />supplement.ul water could be pnmped tl) the Riverside cR.oaJ Illlnua.lly.
<br />This pumpn.ge would enable the service area to be increased. from
<br />22,909 acres to approximately 27,000 ucres, and the impro\'ement of
<br />the waler .upply would be frum 75,5 percent to 86.2 percent of the
<br />c.ompulf.d requirement.. I J .
<br />The Riyerside service n.rea is not included in the Lower South Platte
<br />Wtl.ter Conservancy District.
<br />
<br />BijDU pumping plum
<br />
<br />A ptlmping plant ('(luJd be const.rw;-ten below the Nt1.rrow~ Dl'-m to
<br />pump wnter from t.he. Fort. ]\!IOJ'gSD Cnllill ontlet. works to the Bijoll
<br />Canl1.L Some preliminary cost. estim8.l.es uf this instllUation were pre-
<br />
<br />pared, but 'were not refined because hydrology studies indicated. that
<br />"pproxim"',ely the same quantity of wal<31' could be provided without
<br />construrlion Ibrough an exchange arrangement between Narrows
<br />Reservoir bond t.he Bijou CR.nu.l. Such an arraogement is possible sincs
<br />the Bijou diversion facilities are upstream from t.he reservoir.
<br />Approximately 18,000 IIcre-feet per year could be excbanged to
<br />the ~ijou syst.em, thlls providiD~ ~3.5 perceut of tne theoretical
<br />reqUIrement. to tbe 33,900 a.ctes of Ifngable land served by the system.
<br />These lands are not" part of the Lower South Platte Water Con-
<br />servancy District.
<br />
<br />~uid weU field
<br />
<br />A field of eight wells located about 5 miles west of JuIesburg, Cola"
<br />('ould be constructed to provide supplemental water for the Julesburg
<br />Irrigation District. The wells would be constructed in two ro\....s oC
<br />four wells each, The roWS would be one-h'alf mile apart, and tbe
<br />wells within the rows would be spaced at 1,OOO~Coot inter~als.
<br />Tbe depths of the welIs would average approxim"tely 180 feel"
<br />!ind their casings, constructed of beavyweight mo.terial, would be
<br />18 inches in diame.ter. The pumps would be set at an average depth
<br />of l6D feet, a.nd would be driven by 40-horsepower electric motors.
<br />Water from the weUs would he collected and conveyed to the Peterso-ri .
<br />CUDal in precast concrete pipelines.
<br />Yields ayeraging .bout, ,1 ,800 gallons per minute or 4 eu bie foot
<br />per second, could probably be obtained from e"ch weli. Total pumpage
<br />during tbe 4-month irrigation season, June through Sept.ember. would
<br />be approximately 7,700 "cre-feet,
<br />Through the development of this well field, gre"'er use couId be
<br />made of the ground-water supplies ll.vu.ilable in the lower part of the
<br />has;n, Howe,-er, further study would be required t.o determine the
<br />probn.ble effects ou ~urface supplies for ditches that di \'ert in Nebraska.
<br />
<br />Bijoll Creek diversion channel
<br />
<br />The 19,51 plan for the Narrows \illi, inc.luded provisions for the
<br />diverslon of Bijou Creek into tbe Narrows Reservoir for lIood control.
<br />This potentiolity was again tUlalyzed following the flood of June 1965,
<br />Howe\"er, residents of the Biiou VaHey are mterested also in upstream
<br />control and flood protect-ion if this alternative is at. all possible. The
<br />Corps of Engineers currently is studying the fessibilitv of such con-
<br />trol; the Soil Conservation Service is also conducting a. conCUrrent
<br />study, In the event th"t the cooperating agencies and the State of
<br />Colorado complete their findings without. fOnTIlI.]ating a. more economi-
<br />cal alternative plM for cOnLrol of Bijou floods in the South Platte
<br />River Valley, tbe faeilities to divert Bljou Creek into Narrows Re.er-
<br />voir could be constructed fl.t any time to be complementary to up-
<br />streulll works. No change would be required in the design of Narrows
<br />Da.~; hO\yever, the allocatioll of reservoir stora~e would req uire min or
<br />modlficatwns to compensate for the adde.d sedJrnent which would be
<br />c"rried into tbe reservoir from Bijou Creek.
<br />A ]..lotential channel, as studied III 1965, would intercept Bijou Creek
<br />s\,uth. of tbe N arrows Reservoir a.~d woul~ extend in a nortbeasterly
<br />directIOn for about. 30,000 feet to discharge mto tbe reservoir, It would
<br />have 0. minimum \\-idth of 600 feet und R capacity of 400,000 cubic
<br />feet per second u"ith B. water depth of 25 feet, Banks on both sides of
<br />
<br />.::l
<br />
<br />~-
<br />
<br />:-
<br />
<br />:.1
<br />~
<br />
<br />9...:HSl o-e8---------4
<br />
|