My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06952
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:06 PM
Creation date
10/12/2006 2:00:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.128.A
Description
Silt Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1945
Author
USDOI - BOR
Title
Silt Project-Colorado (Draft of Project Planning Report) Part 1 of 2
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1'- <br />C0 <br />...~ <br /> <br />PROJECT WORKS AND COST ESTIMATE <br /> <br />Project Works <br /> <br />The plan of development calls for Government construction of the <br /> <br />following: <br /> <br />A- A dam and appurtenant works for the impounding <br />of 10,000 acre-feet of water on Rifle Creek at <br />the Rifle Gap Reservoir site. <br /> <br />E- Improvements to the 5-} mile long Grass Valley <br />Canal for better service to project, and to <br />eliminate seepage losses from the canal. <br /> <br />C- Two laterals, one of 20 second-feet of capacity <br />and a second of 12 second-feet capacity, in Dry <br />Elk Valley each approximately four miles long to <br />serve new arable land in the valley. <br /> <br />D- Low head pumping facility at the Rifle Gap dam <br />for providing irrigation service to the Davie <br />Ditch during that part of the year water in the <br />reservoir will be too low for diversion by <br />gravity, <br /> <br />The reservoir will conserve the winter flow and spring high water <br /> <br />flood flow of Rifle Creek and make the sallle available for use on lower <br /> <br />Rifle Creek lands which hold the prior water rights of the Creek. With <br /> <br />lower Rifle Creek lands supplied from the reservoir, the flow of East <br /> <br />Rlfle Creek will largely be available for diversion by the Grass <br /> <br />Valley Canal to project lands. <br /> <br />Rifle Gap Reservoir <br />The Rifle Gap Dam will be a rolled earth fill structure. A concrete <br /> <br />lined tunnel through the right abutment will convey the flow of Rifle <br /> <br />Creek during const~~ction. After construction a 36" emergency gate will <br /> <br />be installed in a gate chamber and a 39" steel pipe will convey water <br /> <br />to two 20" segmental jet valves for controlling discherge. The spill- <br /> <br />way will be an open uncontrolled concrete lined channel on the left <br />
The URL can be used to link to this page
Your browser does not support the video tag.