My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06952
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:25:06 PM
Creation date
10/12/2006 2:00:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.128.A
Description
Silt Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1945
Author
USDOI - BOR
Title
Silt Project-Colorado (Draft of Project Planning Report) Part 1 of 2
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.; <br />co <br />..~ <br /> <br />constructed a pumping ph.nt on the bank of the Colorado River and is <br /> <br />presently using Colorado River water by pumping the same under static <br /> <br />head of 347 feet. Capacity of the pumping plant is for a discharge of <br /> <br />one second-foot. <br /> <br />Pump energy cost, exclusive of operation, maintenance and depreciation <br /> <br />of pumping plant, is 12 dollars per acre-foot. The pumping plant is <br /> <br />operated only at such times as the water is needed by the City. The <br /> <br />quality of the water pumped from the river is comparable with water which <br /> <br />can be supplied the City by gravity from the Rifle Gap Reservoir. Pro- <br /> <br />vi sion has been made. in plan of development for participation by the City <br /> <br />in the project to the extent of 1,000 acre-feet of water. <br /> <br />Possibilities of Multiple Use <br /> <br />The project will serve primarily for irrigation with some water to <br /> <br />be provided Rifle City for culinary purposes as previously discussed. <br /> <br />River regulation for the development of hydro electric power in connection <br /> <br />with the Rifle Gap Reservoir has been studied and found to be uneconomical <br /> <br />due to the limited water supply of Rifle Creek. The seasonal power <br /> <br />possible of generation during the irrigation months by the release of <br /> <br />water for lower irrigation will not justify the attaching cost. <br /> <br />.. <br />F <br /> <br />Rifle Creek in the vicinity of the Rifle Gap Reservoir site has no <br /> <br />fishery values due to Slll"..I!Ier cloudburst floods. A reservoir with a <br /> <br />capaci ty as planned will no doubt have some value for boating and <br /> <br />recreation but without fish life an allocation of cost for such purposes <br /> <br />is questiona,ble. The Fish and Wildlife Service 'lnd the National Park <br /> <br />Service will, therefore, have no interest in the development. <br /> <br />u <br />
The URL can be used to link to this page
Your browser does not support the video tag.