Laserfiche WebLink
<br />" <br /> <br />\' ,: <br />,', <br /> <br />" <br />,-:. <br /> <br />\ <br /> <br />NATURAL FLOW <br /> <br />. <br /> <br />. <br /> <br />o 'Colorado River Natural Flows Meetinq <br />Condition Jig. 1 [Col. 0, where 0 > F+G+H+N) <br /> <br />P <br /> <br />Q <br /> <br />R <br /> <br />S <br /> <br />v <br /> <br />v <br /> <br />\ <br /> <br />T <br /> <br />a) sufficient flow available to meet <br />all demands; <br /> <br />b) checking not required; <br /> <br />c) powerJUa,nLatc.apa.citY:L___. <br /> <br />JL of Davs Durinq Irriqation Season. <br />Cumulative number of days Condition 1 is <br />met. <br /> <br />Colorado <br />Condition <br />o >F+H+N). <br /> <br />a) GVIC junior right is short; <br /> <br />River <br />H2. .3.. <br /> <br />Natural Flows Meetinq <br />[Remaining Col. D where <br /> <br />b) All other rights are filled; <br /> <br /> <br />c) Checking not required; <br /> <br /> <br />d) Power plant at capacity. <br /> <br />JL of Davs Durinq Irriqation Season. <br />Cumulative number of days Condition 2 is <br />met. <br /> <br />Colorado River Natural <br />Condition No. J.' [Remaining <br />o > F-L+H+N). <br /> <br />a) GVIC junior right has no supply; <br /> <br />Flows Meetinq <br />Col. 0, where <br /> <br />b) All other rights are filled; <br /> <br />c) Checking is employed to maximize power <br />generation, only power water is checked; <br /> <br />d) Power plant at capacity; <br />e) Spilling at roller dam. <br /> <br />JL of Davs Durinq Irriqation Season. <br />Cumulative number of days Condition 3 is <br />met. <br />