Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />u <br /> <br />Colorado River Natural Flows Meetinq <br />Condition No. i. [Remaining Col. D, where <br />D > H+N). <br /> <br />a) GVIC junior right has no supply: <br /> <br />b) All other rights are filled: <br /> <br />c) Check operates to full power plant <br />usa-ge, plus the pu.ping taUwater necessary <br />------to fully -supply the Gvt-e-sen1.Or -right: <br /> <br />d) Power plant at capacity; <br /> <br />e) Spilling at Roller Dam. <br /> <br />11 <br /> <br />1. of Davs Durinq Irriqation Season. <br />Cumulative number of days Condition 4 is <br />met. <br /> <br />w <br /> <br />Colorado River <br />Condition H90e 'j. <br />D>F+I+K+N) <br /> <br />a) GVIC junior right has no supply: <br /> <br />Natural Flows Meetinq <br />[Remaining Col. D, where <br /> <br />b) All other rights are filled except OMID <br />Power Plant; <br /> <br />c) Check operates to full demand of GVIC <br />senior riqht not supplied by Plateau Creek; <br /> <br />d) Power plant is short; <br /> <br />e) Roller Dam is closed, no spill. <br /> <br />x <br /> <br />1. of Davs Durinq Irriqation Season. <br />Cumulative number of days Condition #5 is <br />met. <br /> <br />y <br /> <br />Colorado River Natural Flows Meetinq <br />Condition No.~. [All remaining in Col. D). <br /> <br />a) GVIC junior right has no supply; <br /> <br />b) OKID and GV PROJECT must share irrigation <br />supply shortages; <br /> <br />c) Check operates to full demand of GVIC <br />senior right not supplied by Plateau Creek; <br />