My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06915
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:54 PM
Creation date
10/12/2006 1:58:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.43.H.2
Description
Grand Valley/Orchard Mesa -
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/25/1988
Title
Operation of Checkbacks - 1977 Daily Model
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />F <br /> <br />Grand Valley Irriaation Company .2.1.Q cfs <br />Without Plateau Creek. GVIC senior demand <br />from the Colorado River, assuming that the ! <br />total demand is reduced by the 1'1 nw of :<0 ~~'-t ~ <br />Plateau Creek. [Col. E-C]. <br /> <br />G <br /> <br />Grand Valley <br />Junior Riaht. <br /> <br />Irriaation Company 120 cfs <br />120 cfs April 1S-0ctober 15. <br /> <br />. ,~' <br /> <br />I <br /> <br />Orchard Hesa Irriaation District (OMIlt) <br />Power Canal and Siphon. Canal capaciby <br />assuming~fun""utllizat1on ~bynGrand Valley <br />Project during the irrigation season. <br />April 1.-1.4, 800 ofs; April 1S-0ctober 1"5, <br />770 cfs; October 16-31, 800 efs. <br /> <br />OHIO Vinelands. Supply to Vinelands area <br />directly from power canal, upstream from <br />penstocks. 17 cfs, April 15-0ctober 15. <br /> <br />H <br /> <br />.~ ", '.' . <br /> <br />J <br /> <br />OHIO HYdraulic Pump Plant. Penstock <br />capacity for proYiding lift for 171 e~.fol!' <br />irrigatien. Assumes no reduction ift> <br />effielen~ for "check" operations. 272 cfa, <br />April 1S-0ctober 1.!b <br /> <br />K <br /> <br />OHIO Irriaation SupplY Canals. &laliall.on <br />pumping capacity at maximum utilizatien, <br />with no reduction in efficiency duriJlg <br />"check. operation. 1.71 ets, April 15... <br />october 15. <br /> <br />L <br /> <br />OHIO Public Service Companv Power Plant. <br />Optimum water supply for power generation at <br />full utilization of irrigation supply <br />syste_. ~il 1-14, &aG. cfs; April 15- <br />.....--... <br />October 15, i3J,~0; cfs; October HI-31, 800 cfs. <br /> <br />,. 7 0 ~ ::;: _::' - )L <br /> <br />M <br /> <br />Grand Vallev Water Users Association ~"~.c~." <br />(GVWUA), Grand Valley proiect (GV PROJ), U~5_.p+n~ <br />Roller Dam Diversion. Total diversions a~ <br />roller dam to supply Grand Valley Project <br />and OMID.- April 1-14, 800 of.., A,pril 15- <br />OctO~~5,. 1,620, cfa; October 16-31, 800 <br />cfs':' - '._,- <br /> <br />N <br /> <br />GV PROJ. Hiahl1ne Canal. Diversions at <br />roller dam which supply the Government <br />Highline Canal, which also serves the <br />Palisade Irrigation District and Hesa County <br />Irrigation District. 850 cfs, April 15- <br />October 15.' <br />
The URL can be used to link to this page
Your browser does not support the video tag.