Laserfiche WebLink
<br />~ <br />r- <br />I"- <br />N <br /> <br />c <br /> <br />. <br /> <br />- <br /> <br />. <br /> <br />.....,; <br /> <br />. <br /> <br />-" <br /> <br />. <br /> <br />. <br /> <br />20 <br /> <br />on the first day of August of each year for tbe control of <br /> <br />rainflooda. <br /> <br />Two, a 1 January minimum storage space is required <br /> <br />each y.ar tor the control of _nowmelt flood_ during the <br /> <br />spring and summer. The Amount of storag_ space v.ri.s from <br /> <br />plan to plan. If necessary, water IlWlt be role.se4 frOll tile <br /> <br />Dam prior to January to provide thi_ apace. <br /> <br />Three, EACh plAn specifi.. a maximum oontroll.d <br /> <br />relea.e. <br /> <br />Four, Space-building r.l..... needed to insure <br /> <br />1 January stor.ge begin 1 Auqust of each year for all plans. <br /> <br /> <br />Under the current plan, apace building begina on 1 OCtober. <br /> <br />Pi ve, ".!\e.e apace-buildinljJ relea..s, that 18, August <br /> <br />, ' <br /> <br />to December, would be limited to not IIlOr. than twenty-eight I. <br /> <br />, , <br /> <br />thousand cuble-feet-per-.eeond (28,000 eta). I'll repe,t <br />that. Would be limited to not IIIOnt than twenty-eight <br /> <br />thousand eublc-feot-per-..cond (28,000 efs). Onder the <br /> <br />current plan, space-building rel.a.es are limited to forty <br /> <br />thousand cublc-fe.t-per-.eeond (40,000 cta.). <br /> <br />Six, Each plan ba. a .et of stepped releas.. to <br /> <br />control snowmelt flood.. <br /> <br />Seven. neservoir operation trom January through July <br /> <br />i. based on monthly snowmelt runoff forecasts. <br />And finally, eight. Cenerally, available storage <br /> <br />space in Lak. Powell and other upstream reservoirs may be <br /> <br />,,' count.d 1n l1f1\I of space in Laka Uaad behind lIoover Dam. <br />