My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06896
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:50 PM
Creation date
10/12/2006 1:57:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.P
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
4/30/1979
Author
USACOE
Title
Transcript of the Formal Presentation at the Public Hearings for Re-evaluation of A Flood Control Operation Plan for Hoover Dam
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />r- <br />I"- <br />N <br /> <br />c <br /> <br />. <br /> <br />- <br /> <br />. <br /> <br />.....,; <br /> <br />. <br /> <br />-" <br /> <br />. <br /> <br />. <br /> <br />20 <br /> <br />on the first day of August of each year for tbe control of <br /> <br />rainflooda. <br /> <br />Two, a 1 January minimum storage space is required <br /> <br />each y.ar tor the control of _nowmelt flood_ during the <br /> <br />spring and summer. The Amount of storag_ space v.ri.s from <br /> <br />plan to plan. If necessary, water IlWlt be role.se4 frOll tile <br /> <br />Dam prior to January to provide thi_ apace. <br /> <br />Three, EACh plAn specifi.. a maximum oontroll.d <br /> <br />relea.e. <br /> <br />Four, Space-building r.l..... needed to insure <br /> <br />1 January stor.ge begin 1 Auqust of each year for all plans. <br /> <br /> <br />Under the current plan, apace building begina on 1 OCtober. <br /> <br />Pi ve, ".!\e.e apace-buildinljJ relea..s, that 18, August <br /> <br />, ' <br /> <br />to December, would be limited to not IIlOr. than twenty-eight I. <br /> <br />, , <br /> <br />thousand cuble-feet-per-.eeond (28,000 eta). I'll repe,t <br />that. Would be limited to not IIIOnt than twenty-eight <br /> <br />thousand eublc-feot-per-..cond (28,000 efs). Onder the <br /> <br />current plan, space-building rel.a.es are limited to forty <br /> <br />thousand cublc-fe.t-per-.eeond (40,000 cta.). <br /> <br />Six, Each plan ba. a .et of stepped releas.. to <br /> <br />control snowmelt flood.. <br /> <br />Seven. neservoir operation trom January through July <br /> <br />i. based on monthly snowmelt runoff forecasts. <br />And finally, eight. Cenerally, available storage <br /> <br />space in Lak. Powell and other upstream reservoirs may be <br /> <br />,,' count.d 1n l1f1\I of space in Laka Uaad behind lIoover Dam. <br />
The URL can be used to link to this page
Your browser does not support the video tag.