My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06896
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:50 PM
Creation date
10/12/2006 1:57:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.P
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
4/30/1979
Author
USACOE
Title
Transcript of the Formal Presentation at the Public Hearings for Re-evaluation of A Flood Control Operation Plan for Hoover Dam
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"<:t <br />t'- <br />r- <br />C'! <br /> <br />. <br /> <br />- <br /> <br />,. <br /> <br />-- <br /> <br />. <br /> <br />-- <br /> <br />. <br /> <br />. <br /> <br />" <br />, <br /> <br />21 <br />With these eiqh~ (8) common elements in mind, I will <br /> <br />noW briefly outline some of the nine (9) alternatives. I <br /> <br />will not go into each one 1n detail beeau.. of the time it <br /> <br />would take, but I will discuss tho.. that are most <br /> <br />repre.entative of Hoover Dam'. three (3) prtNary purposes, <br /> <br />flood oontrol, water conse~ation, and power production. <br /> <br />Aa I go through these alternatives, I invite your <br /> <br />attention to the table on pag. 12. And I'm Borry, bu't some <br /> <br />of you ait'tinq up here I'm afraid are goinq to have trouble <br /> <br />sacing your broohures. <br /> <br />Your undera~anding of 'the plan. might be aided by <br />I <br />bearing in min4 that the only operational 41tterence. between I <br /> <br />plan8 1s the time and amount of water r.l.as.d frOlll the DI11'II. <br /> <br />Alternative 1 in the array b v.ry ailllUar to the <br /> <br />exiatinq plan for flood control operation of Hoover. we <br />,I <br />are using it as a bas. from which to compare the other <br /> <br />eiqht (9) alternatives. <br /> <br /> <br />The required 1 January storage space tor Alternativ. I <br /> <br /> <br />det.rmined by trial and error to be the spac. requiredl <br /> <br />2 <br /> <br />wa. <br /> <br />to control the hhtorical flow record to the amall.st <br /> <br />maximum releas.. Our s~udy used in this flow record -- us.d <br /> <br />the flow record for the Past: ..venty-two (72) years, and If <br /> <br />thi. record. should be rapeated, under t.his plac IlIAxiawa <br /> <br />'; <br /> <br />r.l.... would be abOut thlrt.y-four tbou.and CUbic-f..t-per- <br /> <br />second (34,000 cfs). Alternativ. 2 lavors flood control. <br />
The URL can be used to link to this page
Your browser does not support the video tag.