My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06896
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:50 PM
Creation date
10/12/2006 1:57:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.P
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
4/30/1979
Author
USACOE
Title
Transcript of the Formal Presentation at the Public Hearings for Re-evaluation of A Flood Control Operation Plan for Hoover Dam
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~J <br />roe <br />roe <br />C\I <br />c.., <br /> <br />. <br /> <br />'-' <br /> <br />. <br /> <br />"-' <br /> <br />. <br /> <br />-- <br /> <br />" <br /> <br />, , <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />.._,__.__...__.. '_.0 ____. _ ....___________________ <br /> <br />u <br /> <br />wo can to insure capacity tor t100d control, we may hav. <br /> <br />wasted wAt.r which oou1d have been u.ed for irrigation and <br /> <br />municipal water 8upply. And at anywhere trolll ten ($10.00) <br /> <br />dollars to on. hundred ($100.00) dollar. an aore-toot <br /> <br />dopendintjJ on the circWllstance& and the market, that'. a very <br /> <br />reAl eoonomic tactor to be contended with. <br /> <br />On the other band, it we store all the water we can <br /> <br />at every opportunity, flood control .utter. becau.e the <br /> <br />CApacity d.diCAted to that tunction i& taken up with <br /> <br />impound.d water. And flood control i. extremely important, <br /> <br />especially now that the Colorado .y.te. i. praotioally tull. <br /> <br />or, if flood control r.l..... are greater th.n power <br /> <br />planto can use, then hydro-electric eneriY production i. <br /> <br />lost. Of oourse, the importance of ol.an, relatively cheap <br /> <br />oner9Y ne.ds no further comment. <br /> <br />,I <br /> <br />So with all the Dam'. purpose. conaidered, the Corp. <br /> <br />and the Bureau have developed nine (9) alternative plana tor <br /> <br />flood control operation ot Hoover. Each is deeiqned to <br /> <br />.ither tavor one purpose, flood control, water con.ervation <br /> <br />'" or power production, over the othera or is de.tined t.o <br /> <br />represent A balance amonq the three (3) purpo..a. <br /> <br />Althouqh the plana differ in the purpos.s they favor, <br /> <br />,I <br /> <br />eaah haa eight (8) element. in common with the others, <br /> <br /> <br />First, each alternat.ive requires that a minimum of <br /> <br />1.5 million acre-f.e' of atoraqe in Lake Mead be available <br />
The URL can be used to link to this page
Your browser does not support the video tag.