My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06770
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06770
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:10:57 PM
Creation date
10/12/2006 1:51:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
4/19/1965
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br /> <br />. <br /> <br />. <br /> <br />GUiL.01 <br /> <br />first week of April snowslides in the left keyway area caused the contractor to sus- <br /> <br />pend excavation operations unti I weather conditions change and the soi I becomes <br /> <br />more stable. <br /> <br />On April 8 the Bureau of Reclamation opened bids for construction of the dif- <br /> <br />ficult 6 1/2-mile access road to the Crystal damsite--the first construction contract <br /> <br />for work related to the dam. The apparent low bid for this road construction was sub- <br /> <br />mitted by H-E Lowdermilk Company, Englewood, Colorado, in the amount of $936,269. <br /> <br />This contract has not yet been awarded. <br /> <br />On the SI L T PROJECT, general progress was accelerated during March. The <br /> <br />Rifle Gap Dam contractor's efforts have been concentrated On cutoff trench excava- <br /> <br />tion and highwoy construction. State Highway 325 and a county road will be relocated <br /> <br />to take traffic out of the construction area at the bottom of the gap. The State high- <br /> <br />way will cross the crest of the dam. The tunnel subcontractor holed through the <br /> <br />diversion tunnel and the Davie Ditch outlet tunnel during the latter part of March. <br /> <br />The contractor plans to start placing earth in the dam embankment about mid-April. <br /> <br />Award of contract has been made for construction of the Silt Pump Canal which <br /> <br />wi" convey irrigation water to lands on the lower portion of Harvey Mesa, with work <br /> <br />scheduled to begin immediately. Bids were opened on April 6 for reconstruction of <br /> <br />about 6 miles of the existing Davie Ditch, to provide a full water supply for project <br /> <br />lands on Davie Mesa. Low bid submitted was in the amount of $308,000; award of <br /> <br />contract is pending. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.