My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06728
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:07 PM
Creation date
10/12/2006 1:50:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.140
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1987
Title
Reclamation's Proposal for Implementing the Salinity Control Improvements Within the Grand Valley Irrigation Company Service Area
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C) <br />00 <br />0) <br /> <br />. . <br /> <br />-, <br />. .. <br /> <br />Improved laterals would be eligible to participate in future <br /> <br />r--, <br /> <br />-:".::' <br /> <br />"replacement construction" provided they execute H formal agreement <br /> <br />with GVIC to perform O&M and inspections. In addition, the improved <br /> <br />lateral would pay its share of base O&M cost to the GVIC. <br /> <br />Willingness of a lateral to participate infers the following: <br /> <br />(1) That landowners, when notified, will sign an agreement <br /> <br />to <br /> <br />allow <br /> <br />rights-of-entry <br /> <br />for <br /> <br />Reclamation <br /> <br />or <br /> <br />its <br /> <br />representatives to enter their property along the affected <br /> <br />lateral. <br /> <br />(2) That landowners will donate easements through their property <br /> <br />for construction and the O&M. <br /> <br />(3) That GVIC will hold the acquired easements for the <br /> <br />participating lateral. <br /> <br />(4) That GVIC will make and collect the assessments for base <br /> <br />O&M on the participating lateral. <br /> <br />(5) That GVIC will perform O&M tasks on the improved lateral <br /> <br />system in perpetuity. <br /> <br />(6) That 100 percent of the lateral stockholders agree to <br /> <br />participate. <br /> <br />(7) That a mutually acceptable base O&M cost will be established <br /> <br />and <br /> <br />agreed <br /> <br />to by <br /> <br />the <br /> <br />lateral <br /> <br />stockholders <br /> <br />be fore <br /> <br />construction begins. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.