My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06728
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:07 PM
Creation date
10/12/2006 1:50:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.140
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1987
Title
Reclamation's Proposal for Implementing the Salinity Control Improvements Within the Grand Valley Irrigation Company Service Area
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />[-- <br />00 <br /> <br />. <br /> <br />. <br /> <br />,...., <br />-. <br />c.:.:, <br />~ <br />. ' <br /> <br />General Approach <br /> <br />(".:,) <br /> <br />Overview Responsibilities <br /> <br />Reclamation will fund all activities performed by GVIC to carry <br /> <br />out the provisions of this proposal. Reclamation will provide funds <br /> <br />to conduct the participation survey, secure rights-af-entry, and, <br /> <br />as required, pay for easement and associated land surveys, preparing <br /> <br />of easement descriptions and filing these with the county recorder. <br /> <br />In addition, Reclamation will pay for damages incurred as a result <br /> <br />of easement and associated surveys and damages associated with removal <br /> <br />of properties or losses incurred during construction. <br /> <br />Reclamation <br /> <br />will require temporary easements for constructi.on and permanent <br /> <br />easements for operation and maintenance and prefers these to be <br /> <br />donated to the GVIC. <br /> <br />GVIC will operate, maintain, and perform <br /> <br />replacement construction as needed in perpetuity. <br /> <br />Reclamation will <br /> <br />provide all construction funds and administer construction contracts. <br /> <br />Reclamation will also draft the long-term OM&R contract and negotiate <br /> <br />it to the mutual benefit of GVIC and Reclamation. <br /> <br />Reclamation will <br /> <br />fund additional O&M expenses. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.