My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06728
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:07 PM
Creation date
10/12/2006 1:50:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.140
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1987
Title
Reclamation's Proposal for Implementing the Salinity Control Improvements Within the Grand Valley Irrigation Company Service Area
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />L'" <br />en <br />c:r. <br /> <br />. <br /> <br />. <br /> <br />(d) <br /> <br />Reclamation will prepare a design data package to <br /> <br />-~ <br />r- <br /> <br />::.:) <br /> <br />submit <br /> <br />to Reclamation 0 s Engineering and Research <br /> <br />Center (E&RC) in Denver to be used for preparing <br /> <br />design and specifications. <br /> <br />The design data package <br /> <br />will also specify required temporary and permanent <br /> <br />easements. <br /> <br />GVIC and property owners will be given <br /> <br />the opportunity to review and comment on the design <br /> <br />data package before submittal to the E&RC. <br /> <br />(3) Designs and Construction <br /> <br />Designs and specifications will be prepared by Reclamation. <br /> <br />GVIC and property owners will be given the opportunity to review <br /> <br />and comment on them before they are finalized. <br /> <br />Specifications <br /> <br />will be finalized and contracts awarded by Reclamation for <br /> <br />installing the improved pipe lateral system. <br /> <br />Reclamation will administer the construction contracts to insure <br /> <br />that <br /> <br />the pipe laterals are installed as stated in the <br /> <br />specifications. <br /> <br />Reclamation will prepare an environmental <br /> <br />commitment check list which will be used during construction <br /> <br />to insure that the contractors comply with all stipulations <br /> <br />in the Environmental Impact Statement. <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.