My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06728
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06728
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:07 PM
Creation date
10/12/2006 1:50:39 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.140
Description
Grand Valley Unit-Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1987
Title
Reclamation's Proposal for Implementing the Salinity Control Improvements Within the Grand Valley Irrigation Company Service Area
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.- <br />~ <br />0; <br /> <br />. <br /> <br />. <br /> <br />cr. <br /> <br />(2) Design Data Collection <br /> <br />c <br /> <br />C:::1 <br /> <br />Reclamation proposes to collect design data for each lateral <br /> <br />group using the following steps: <br /> <br />(a) A field inventory will be conducted of all 100 percent <br /> <br />participating laterals within the <br /> <br />lateral group. <br /> <br />Inventory would consist of determining if the lateral <br /> <br />qualifies <br /> <br />for participation, mapping the lateral <br /> <br />system, <br /> <br />and documenting the existing conditions. <br /> <br />Required lateral capacities and system demands will <br /> <br />be calculated as a result of the field work. <br /> <br />(b) When all the inventory information has been compiled, <br /> <br />Reclamation and the GYIC will meet with each individual <br /> <br />landowner to discuss and agree to proposed alignments, <br /> <br />delivery point(s), and delivery flow. <br /> <br />(c) Reclamation will locate and document the proposed <br /> <br />alignment easements, delivery points, and special <br /> <br />features. <br /> <br />Reclamation will define requirements for <br /> <br />construction easements that may be important in the <br /> <br />system design and construction. <br /> <br />Permanent easement <br /> <br />requirements <br /> <br />will <br /> <br />be <br /> <br />specified <br /> <br />by <br /> <br />GYIC <br /> <br />after <br /> <br />consultation with Reclamation and property owners. <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.