Laserfiche WebLink
<br /><.r; <br />en <br />c:: <br /> <br />r- <br /> <br />"',-. <br /> <br />. <br /> <br />. <br /> <br />(4) Operation, Maintenance, and Inspection <br /> <br />Reclamation will test the laterals to insure that they are <br /> <br />operating correctly. <br /> <br />Operation and maintenance of the laterals <br /> <br />will be transferred to GVIC when it has been determined that <br /> <br />the lateral systems are operating properly. <br /> <br />Provisions of <br /> <br />the transfer will be negotiated as part of the O&M contract <br /> <br />between Reclamation and GVIC. <br /> <br />Reclamation will be responsible to correct all construction <br /> <br />deficiencies. <br /> <br />Reclamation will periodically inspect the improved laterals <br /> <br />to insure that the provisions of the OM&R contract are being <br /> <br />carried <br /> <br />The <br /> <br />inspections <br /> <br />and procedures <br /> <br />out. <br /> <br />to correct <br /> <br />deficiencies will be negotiated as part of the O&M contract <br /> <br />between Reclamation and GVIe. <br /> <br />(5) Replacement <br /> <br />Reclamation will fund all major modifications or necessary <br /> <br />reconstruction of the improved lateral system. <br /> <br />(6) Easement Acquisition <br /> <br />Reclamation will review GVre's easement acquisition activities. <br /> <br />12 <br />