Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />OOJ133 <br /> <br />installed depending on. the accessibility of the sites and difficulty of <br />installation (primarily at stream gauge sites). A typical breakdown of <br />these sites would be two repeaters, two or three stream gauges, and two to <br />four rainguages. <br /> <br />The Regional Building Department will supply all materials and equipment <br />required for remote installations. The primary material required is redi <br />mix concrete. Equipment includes a ladder, shovel, pick, mixing pan, and <br />drop bar. A detailed list will be supplied with the system manuals. <br /> <br />One month prior to installation Sierra/Misco will send two complete <br />hardware manuals and an .instructional video tape (VHS format) of a <br />rain gauge installation to enable the Regional Building Department field <br />personnel to prepare for the installation. <br /> <br />2.9.3 System Start Up <br /> <br />System start up will be successfully completed when both base stations, one <br />repeater, two stream gauges, and two raingauges are all operational. <br /> <br />System start up also includes the training which will allow the Regional <br />Building Department field personnel to successfully complete the system <br />installation after the departure of Sierra/Misco's field engineer. The <br />training will also prepare them for the preventative maintenance and <br />toubleshooting required to keep the system operating. <br /> <br />The system start up will be completed in the two week period that the <br />Sierra/Misco field engineer is on site. <br />