My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06559
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:19 PM
Creation date
10/12/2006 1:43:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.112.A
Description
Dallas Creek Participating Project
State
CO
Basin
Gunnison
Water Division
4
Date
3/11/1977
Author
USDOI-BOR
Title
Water Projects Review - Summary Analysis and Detailed Data
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8. Net construction employment impact: <br /> <br />At <br />construction <br />peak <br /> <br />Date <br /> <br />Current <br /> <br />Date <br /> <br />To completion <br />including <br />FY 1978 <br /> <br />Man years <br />Onsite <br />Offsite <br />Total <br />Dollars (millions <br /> <br />305 <br />314 <br />619 <br />. <br />16.6 ' <br /> <br />FY-79 <br /> <br />224 <br />231 <br />455 <br />12.2 <br /> <br />FY-78 <br /> <br />683 <br />701 <br />1,384 <br />37.1 <br /> <br />9. Have opportunity costs of foregone recreation benefits and hydro- <br /> <br />generation been incorporated in the most curretn benefit-cost <br /> <br />ratio calculations? Yes: Recreation benefits claimed by the project <br /> <br />are the ihcrease in 'opportunities or benefits over those evaluated <br /> <br />" <br /> <br />in the "without project situation," except for minor uses in the reser- <br /> <br />voir basin. Hydroelectric generation at storage units ot Colorado <br /> <br />River Storage Project has been based and projected on flows of the <br /> <br />Colorado River and tributaries depleted over time consistent with <br /> <br />allocations under compacts governing the use of water. The benefit- <br /> <br />cost ratios of this project include cost assignments of mainstem <br /> <br />reservoirs equal to the proportionate use of such reservoir essential <br /> <br />to maintaining compact flows at Lee Ferry. <br /> <br />10. Water use proposed by project <br /> <br />a. Irrigation <br /> <br />Acre-feet of water diverted <br />Acre-feet of water consumptively used <br />Acre-feet of water lost LO incidental <br />bo~der areas and phreatophytes <br />Acre-feet of'water returning to stream <br /> <br />11,200 <br />4,300 <br /> <br />800 <br />6,100 <br /> <br />) , <br />.(..t~f'~,~ <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.