My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06559
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:19 PM
Creation date
10/12/2006 1:43:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.112.A
Description
Dallas Creek Participating Project
State
CO
Basin
Gunnison
Water Division
4
Date
3/11/1977
Author
USDOI-BOR
Title
Water Projects Review - Summary Analysis and Detailed Data
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />b. Municipal and Industrial <br /> <br />c. <br /> <br />Acre-feet of water diverted <br />Acre-feet .of water consumptively used!7 <br />Acre-feet of water returning to stream <br />Avg. projected daily per capita use, 300 gal. <br /> <br />Fish, Wildlife, and Recreation <br /> <br />Acre-feet of water d~verte~/ <br />Acre-feet of water consumptively usedl/ <br />Acre-feet of water returning to strea~/ <br /> <br />28,100 <br />10,400 <br />17 700 <br />city, lAo gal; rural <br /> <br />6,900 <br />6,900 <br /> <br />d. Evaporation <br /> <br />Acre-feet of water evaporated from <br />Ridgway Reservoir <br /> <br />1,600 <br /> <br />" <br /> <br />!/ D~versions and returns for Municipal and Industrial uses <br />are not anticipated to loose any water to incidental border <br />areas and phreatophytes., <br /> <br />1/ Includes. 6,800 acre-feet average annual bypass from reser- <br />voir for maintenance of downstream fishery. <br /> <br />1/ Some consumption use.for recreation. <br /> <br />11. Are projected costs within the current project authorization ceiling? <br /> <br />No. The appropriation ceiling for tqe project was included with the <br /> <br />total authorization to be approp~iated by P.L. 90-537. The total <br /> <br />amount authorized to be appropriated is $768,017,000. The current <br /> <br />estimate for comparison with the appropriation ceiling is $818,100,000. <br /> <br />The appropriation requested for fiscal year 1978 will bring the, total <br /> <br />amount appropriated to $33,782,000. Legislation for additional <br /> <br />appropriation ceiling will be recommended at an appropriate time. <br /> <br />). ~. , <br />t,. t~~: 0{ <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.