Laserfiche WebLink
<br />h. Evaluate Embankment Design <br /> <br />After reviewing and establishing all the material strength <br /> <br /> <br />parameters, the embankment design as proposed by the USBR will be <br /> <br />evaluated. Our "in-house" computer will be used for the evalua- <br /> <br /> <br />tion. Several different and accepted computer methods of analysis <br /> <br />will be used for the evaluation. The design will also be evaluated <br /> <br /> <br />for economy taking into account the available construction mate- <br /> <br /> <br />rials, seepage losses and the safety of the structure. <br /> <br />i. Critique on Independent Panel Report <br /> <br />We will provide a written report to the Water Conservation <br /> <br /> <br />Board on our review and evaluation of the report prepared by the <br /> <br />Independent Panel of Experts. <br /> <br />j. Verbal Briefing <br /> <br />We propose to give a detailed verbal briefing to the Water <br /> <br /> <br />Conservation Board prior to finalizing Our report. The briefing <br /> <br />will assure that all items are adequately covered in the report and <br /> <br />it will provide a final opportunity for the Board to make addi- <br /> <br /> <br />tional technical input into the report if so desired. <br /> <br />k. Prepare Final Report <br /> <br />The final report will be prepared and printed in late Sep- <br /> <br /> <br />tember and early October. The report will be a detailed docu- <br /> <br /> <br />mentation of our review, study, evaluation and recommendations. <br /> <br />1. Submit Final Report <br /> <br />The final report will be submitted to the Water Conservation <br /> <br /> <br />Board about October lOth or some three months after the start of <br /> <br /> <br />the services. <br />