Laserfiche WebLink
<br />- ,..., <, ..~:, <br />~~.i.i <br /> <br />Response 6: The mitigation measure in the Recreation section of the Draft EA that addressed this <br />issue has been modified to address this specific concern by providing additional construction <br />requirements aimed at minimizing impacts to Park visitors, <br /> <br />Comment 7: All roadways, trails and other facilities impacted by construction must be repaired to an <br />acceptable condition following construction activities. <br /> <br />Response 7: The mitigation measure in the Recreation section of the Draft EA that addressed this <br />issue has been modified to address this specific concern by ensuring that the access road and <br />pedestrian/bike trail are returned to pre-construction or better conditions, <br /> <br />Comment 8: We will need to know what the final plan is for stabilizing the diversion structure prior to <br />construction approval. <br /> <br />Response 8: See Response 1. <br /> <br />Comment 9: What is the plan for the long-term management of noxious weeds in those areas that will <br />be disturbed by the construction of the pipeline and pumping station? Who will be responsible for the <br />cost and management of the noxious weeds? <br /> <br />Response 9: The mitigation measure in the Noxious Weed section of the Draft EAthat addressed this <br />issue has been modified to address this specific concern. The mitigation measure makes Pueblo West <br />responsible for monitoring and treating noxious weeds, and re-seeding the construction area on <br />Reclamation lands for up to three years, <br /> <br />Comment 10: All construction activity and storage of construction materials will need to be <br />coordinated with park staff prior to any construction activity, <br /> <br />Response 10: See Responses 1,6, & 7, <br /> <br />23 <br />